Skip to main content

Egis has been awarded a major Turkish highway deal

Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus. OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish
June 25, 2013 Read time: 2 mins
The completion of the Gebze-İzmir highway will help improve traffic flow and reduce peak time congestion in the busy port city
2643 Egis has signed a contract for the operation and maintenance of the Gebze-İzmir highway in Turkey. The agreement was signed with OTOYOL, the concessionaire for the Turkish General Directorate of Highways (3337 KGM). This is the second major contract award for Egis in Turkey, following the Eurasia Tunnel deal, for a 5.4km twin-deck tunnel under the Bosphorus.

OTOYOL was selected by KGM as the private concessionaire for the project. OTOYOL itself is a firm established for the purpose of the Project by five Turkish companies: 3338 Nurol İnşaat ve Ticaret; Özaltın İnşaat Ticaret ve Sanayi; 3340 Makyol İnşaat Sanayi Turizm ve Ticaret; 4149 Yüksel İnşaat; 3342 Göçay İnşaat Taahhüt ve Ticaret; and one Italian company, 1324 Astaldi. After a competitive bidding process, Egis was selected by OTOYOL as its operation partner.

The Gebze-İzmir Project is a tolled highway project procured by KGM under a build, operate and transfer (BOT) model. This is the largest BOT project in Turkey to date. It includes 420km of highway (2x3 lanes) between Gebze (on the North shore of İzmit Bay) and İzmir, as well as a 3km suspension bridge crossing İzmit bay, three tunnels with a total length of 6km and 20 toll stations. The project will be implemented in two phases. The first phase from Gebze to km 58 will include the 3km Izmit bay suspension bridge which is one of the longest suspension bridges in the world by the length of central span

For more information on companies in this article

Related Content

  • Italian JV wins Denmark’s Storstrom Bridge construction deal
    October 27, 2017
    An Italian joint venture has won the construction contract for Denmark’s replacement 4km-long road and rail Storstrom Bridge. The Danish Road Directorate – Vejdirektoratet - awarded the work to contractors Itinera, Condotte and Grandi Lavori Fincosit along with bridge design consultant Seteco Ingegneria as a subcontractor. Estimated cost is around €280 million for the 26m-wide single-support cable-stay structure. The European Union will subsidise the work to around €15 million.
  • Smaller contractors wanted for Melbourne’s North East Link project
    September 27, 2018
    Australia’s Victoria state government has moved to ensure smaller contractors get a share of the US$12 billion worth of Melbourne city’s North East Link contracts. According to a report in the Australian Financial Review, Victoria state treasurer Tim Pallas said that consortiums bidding for North East Link could not include more than one of the top three local contractors. This is to encourage more international companies and smaller Australian contractors to tender for the proposed 26km project.
  • Central Ring Road to become one of most important projects in modern history of road-building in Russia
    December 16, 2014
    Moscow’s new ring road will provide a major economic boost and tackle congestion - Eugene Gerdner writes The Russian Government has officially started building of the Central Ring Road (CRR), one of the largest infrastructural projects in the modern history of the country. Total volume of investments in the project is estimated at more than US$7.2 billion (300 billion RUB). Building of the road should be completed by the World Cup 2018 and will be carried out as part of the existing state program ‘The de
  • Croatia rejects complaints over Peljeski Bridge tender
    April 6, 2018
    Croatia’s public procurement body has rejected complaints by all three international consortia over a winning low tender for the Peljeski bridge. Bids for construction of the four-lane 2.4km bridge were submitted in the middle of last year. The bridge will connect Croatian territory by traversing the Adriatic Sea’s Mali Ston Bay. Vehicles must currently head from Croatia into Bosnia to re-enter a peninsula that is Croatian territory. Croatia’s State Commission for Control of Public Ordering Processes