Skip to main content

dfsdf

sdfsdf
September 14, 2012 Read time: 1 min
1224 Google

The capture of User Persona information has allowed EIBS and Eastbourne BC to form user journeys and Wireframes (page types) for the website redevelopment project. These are defined and described in the section 3 below.

For more information on companies in this article

Related Content

  • Doha’s massive ring road expressway project
    July 10, 2019
    The huge Doha ring road project will help decongest the city and improve transport for Qatar
  • Prepare for ‘interoperability on steroids’
    May 19, 2023
    The gathering of Europe’s toll professionals offers a chance for views to be exchanged by senior people on a number of big issues: and there’s currently an awful lot to think about
  • VIDEO: Queens University Belfast set record with Meccano bridge
    October 8, 2015
    A British university’s Big Bridge Build project has set a world record for the largest Meccano structure. Around 50 students from the School of Planning, Architecture and Civil Engineering at Queen’s University in Belfast, Northern Ireland, spent a year erecting the footbridge across the Clarendon Dock. The structure, at 28.5m long, was built using an estimated 11,000 pieces from Meccano, a children’s engineering construction toy. Laid end-to-end, the pieces would stretch for just under 4km.
  • Highway condition monitoring move
    August 2, 2012
    Geospatial surveying specialist Yotta DCL now has a contract with Southampton City Council for road surface condition monitoring and is using its advanced laser technology. Yotta DCL is surveying 300km of the city's roads using its sophisticated ARAN survey vehicle which uses innovative laser scanning and precision GPS systems. These surveys are operating as part of a UK Government-specified programme called Surface Condition Assessment for the National Network of Roads (SCANNER). This will provide the city