Skip to main content

dfsdf

sdfsdf
September 14, 2012 Read time: 1 min
1224 Google

The capture of User Persona information has allowed EIBS and Eastbourne BC to form user journeys and Wireframes (page types) for the website redevelopment project. These are defined and described in the section 3 below.

For more information on companies in this article

Related Content

  • Giatec promises Smart Concrete
    April 27, 2018
    Giatec’s Smart Concrete concept allows ready mix concrete suppliers to offer optimised mixes to their customers – and to charge more for them. Giatec, which makes concrete sensors and associated software and apps, works with the concrete producers to calibrate their mixes. The concrete company then supplies Giatec’s maturity monitoring sensors as part of the concrete package. “The ready mix suppliers get information straight away so that they can adjust their mixes if necessary,” says Giatec business
  • Topcon’s latest tool for total station connectivity
    April 4, 2017
    Topcon is introducing its MAGNET Construct 2.0 app to deliver connectivity between more instruments. The MAGNET Construct 2.0 is the firm’s next generation app that is intended to drive a wide variety of Topcon total stations from a user’s smartphone or tablet. The first version of the app was purpose-built to drive the LN-100 Layout Navigator system alone. This unit is now available for most Topcon instruments and can run from Android devices or the latest Apple iPhone, iPad, or iPod Touch hardware. Accord
  • Accurate positioning with Topcon
    March 13, 2024

    The new Hybrid Positioning system from Topcon is said to perform faster in the field than stand-alone robotic systems and is more versatile than RTK-only solutions. The latest Hybrid Positioning technology combines GNSS positioning and optical robotic measurements on one rover pole.

  • Ethiopian Roads Authority (ERA) picks Spanish, Chinese contactors
    October 22, 2014
    The Ethiopian Roads Authority (ERA) has contracted out two major road projects to Spanish and Chinese companies. China Hunan Hunda Road & Bridge Construction will build the 111.3km Merkote-Delbo junction-Alaba-Sodo road under a contract worth around US$50 million (€39.12 million). Completion is within two and a half years. Spanish joint venture UTE Elsameks Eco Asphalt Ethiopia 35 will handle the 63km Ambo-Welliso project. Completion is due in three years, with funding of around $59 million from the W