Skip to main content

Design work starts on Inverness West Link Road Project

The Highland Council in northern Scotland has appointed Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the
October 9, 2012 Read time: 2 mins
1. The new Inverness West Link Road will link the Southern Distributor Road at Dores Road with the A82 Trunk Road.
The Highland Council in northern Scotland has appointed 2762 Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. 

The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The 1624 Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the new road, and produce updated estimated costs for the project.

The detailed design work will include the preparation of the drawings and details and the specifications for each construction element of the project in readiness for the Council to prepare tender documents. 

The detailed design work will include the information required by the Highland Council to obtain all statutory consents, including traffic orders, land acquistion and planning.

Councillor Graham Phillips, chairman of the council’s transport environmental and community services committee, said:

“This is a significant piece of work, which will help move the project forward and ensure we maintain momentum to enhance land use planning and deliver an efficient transport network to the south and west of the city.”

For more information on companies in this article

Related Content

  • Symology supplies the foundations for Tarmac’s Street Works business
    April 7, 2017
    UK contractor Tarmac has been in partnership with Symology since 2011, using a shared management service for asset management to meet tougher government street work regulations, writes Matt Waite Tarmac, with more than 6,600 employees, is the UK’s leading sustainable building materials and construction solutions business. The company has over 330 UK sites from which it delivers contracting and highways maintenance services as well as products such as aggregates, asphalt, cement, lime and ready-mix concre
  • Staffordshire road improvements planned
    July 29, 2024
    Staffordshire road improvements will commence shortly.
  • Flyover removal completed successfully
    May 14, 2021
    The removal of a flyover in Perry Barr, Birmingham, has now been completed in the UK. The work was carried out successfully by the contractor Tarmac within a tight timeframe
  • Better maintenance is on the Horizon for UK’s Warrington Council
    May 15, 2018
    Good, readable analysis of road surfaces to ensure sufficient maintenance funding is an essential part of asset management. The technical side of ensuring a good road surface is integral to maintaining safe, superior highway infrastructure. But securing sufficient government funding for such work – repairs and new-build – based on the current road surface is also essential. To evaluate road conditions and structure for such a business case, one UK local council turned to software provider Yotta.