Skip to main content

Design work starts on Inverness West Link Road Project

The Highland Council in northern Scotland has appointed Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the
October 9, 2012 Read time: 2 mins
1. The new Inverness West Link Road will link the Southern Distributor Road at Dores Road with the A82 Trunk Road.
The Highland Council in northern Scotland has appointed 2762 Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. 

The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The 1624 Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the new road, and produce updated estimated costs for the project.

The detailed design work will include the preparation of the drawings and details and the specifications for each construction element of the project in readiness for the Council to prepare tender documents. 

The detailed design work will include the information required by the Highland Council to obtain all statutory consents, including traffic orders, land acquistion and planning.

Councillor Graham Phillips, chairman of the council’s transport environmental and community services committee, said:

“This is a significant piece of work, which will help move the project forward and ensure we maintain momentum to enhance land use planning and deliver an efficient transport network to the south and west of the city.”

For more information on companies in this article

Related Content

  • World’s largest bridge deck for KAIA expansion
    December 16, 2013
    A bespoke formwork solution from RMD Kwikform is playing a key role in creating the largest ever airport cast bridge deck as part of the multi-billion dollar expansion of King Abdulaziz International Airport near Jeddah, Saudi Arabia. The firm is also a leading player in the creation of arterial tunnels under the airport’s elevated roads, another key part of the project’s first phase works due for completion in 2014. Guy Woodford reports
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Italy’s renaissance bridge
    July 21, 2020
    Italian consulting company Italferr created a digital twin for designing the new Genoa bridge and won accolades at Bentley Systems: Bentley Year in Infrastructure Awards