Skip to main content

Design work starts on Inverness West Link Road Project

The Highland Council in northern Scotland has appointed Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the
October 9, 2012 Read time: 2 mins
1. The new Inverness West Link Road will link the Southern Distributor Road at Dores Road with the A82 Trunk Road.
The Highland Council in northern Scotland has appointed 2762 Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. 

The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The 1624 Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the new road, and produce updated estimated costs for the project.

The detailed design work will include the preparation of the drawings and details and the specifications for each construction element of the project in readiness for the Council to prepare tender documents. 

The detailed design work will include the information required by the Highland Council to obtain all statutory consents, including traffic orders, land acquistion and planning.

Councillor Graham Phillips, chairman of the council’s transport environmental and community services committee, said:

“This is a significant piece of work, which will help move the project forward and ensure we maintain momentum to enhance land use planning and deliver an efficient transport network to the south and west of the city.”

For more information on companies in this article

Related Content

  • Kapsch TrafficCom’s the Tolling Wizard of Oz
    April 4, 2014
    Standfirst: Leading tolling technology solution manufacturer Kapsch TrafficCom has recently been appointed to deliver two major electronic tolling projects in Australia, as Guy Woodford reports Kapsch TrafficCom’s new key Australian contracts will see the Austrian firm use its multi-lane free-flow (MLFF) single gantry solution on the Eastern Distributor toll road in Sydney and the Legacy Way toll road in Brisbane. The MLFF single gantry solution includes innovative stereoscopic vehicle detection and classi
  • Learning from Russia's controversial road project
    February 9, 2012
    The International Road Federation (IRF), founded in 1948, is the only world forum advocating better and safer roads through better road design and construction bearing in mind the user. It is a unique institution that brings together members active in road infrastructure from both the private and public sectors. The IRF promotes roads that are safe, economically viable and ecologically friendly. The IRF believes that a sound road infrastructure brings prosperity, fights poverty, furthers education and gi
  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.
  • Innovation in road design and management software
    February 17, 2012
    The emphasis on data processing and re-use, continues to grow in the development of design and management software. The interoperability of software, the need to handle and process larger amounts of data, and re-use and retention of data sets from one task to another have been a growing emphasis in the past few years. It allows infrastructure companies to get better value from expensively collected information and to focus more on the whole life cycle of projects.