Skip to main content

Design work starts on Inverness West Link Road Project

The Highland Council in northern Scotland has appointed Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the
October 9, 2012 Read time: 2 mins
1. The new Inverness West Link Road will link the Southern Distributor Road at Dores Road with the A82 Trunk Road.
The Highland Council in northern Scotland has appointed 2762 Capita Symonds to assist the Council’s Project Design Unit in providing detailed design civil engineering and supporting services for the new US $ 43.85 million (£27.2mn) Inverness West Link Road. 

The scheme will be completed in two phases – a year-long first phase which will involve developing a detailed design which will allow The 1624 Highland Council to subdivide the project into two construction stages, clearly define the layouts and footprints for the new road, and produce updated estimated costs for the project.

The detailed design work will include the preparation of the drawings and details and the specifications for each construction element of the project in readiness for the Council to prepare tender documents. 

The detailed design work will include the information required by the Highland Council to obtain all statutory consents, including traffic orders, land acquistion and planning.

Councillor Graham Phillips, chairman of the council’s transport environmental and community services committee, said:

“This is a significant piece of work, which will help move the project forward and ensure we maintain momentum to enhance land use planning and deliver an efficient transport network to the south and west of the city.”

For more information on companies in this article

Related Content

  • Balfour Beatty begins construction of €23.05mn Merseyside motorway link
    January 31, 2014
    Balfour Beatty this week began construction on a €23.05 million (£19 million) scheme to bypass two congested villages and link communities in Sefton along the west coast of Merseyside in Northwest England directly to the M57 and M58 motorways. The road will be 4.5km long and connect the A565 Southport Road to the motorway junction at Switch Island, avoiding the villages of Thornton and Netherton. The newly designated A5758 Broom’s Cross Road will relieve long-standing traffic issues in the area and provid
  • New functionality for infrasfructure design software
    March 20, 2012
    Chris Bradshaw, Autodesk's vice-president for the Infrastructure Solutions division spoke to World Highways. The launch of the fourth version of its Civil 3D design software early this year will see software maker Autodesk getting serious about its road and general civil engineering package. Bigger projects can be handled in the 2008 version, and a range of new functionality is being added. "Though not everything we would like yet," said Chris Bradshaw, Autodesk's vicepresident for the Infrastructure S
  • UK road contracts planned
    December 13, 2021
    Major road contracts are planned for the UK.
  • Dutch road widening benefits from 3D software
    February 24, 2012
    Modern software is stretching traditional design boundaries on a motorway widening in the Netherlands, reports Adrian Greeman There was a time when civil engineering and aesthetics did not mix too well, especially on roads. The artistic ideas of an architect did not blend with the stringent requirements of structure. But modern three-dimensional modelling software is helping this change. Design notions that might have been overly complicated in the past are now attainable with hi-tech analysis tools.