Skip to main content

Deal struck for Italian airport link

The contract for Italy's new Pedemontana Lombarda highway is likely to be handled by a consortium headed by Austrian contractor Strabag.
February 27, 2012 Read time: 1 min
The contract for Italy's new Pedemontana Lombarda highway is likely to be handled by a consortium headed by Austrian contractor 945 Strabag. The agreement will be finalised in September 2011. The consortium has a provisional deal for design and construction of the €2.3 billion 75km highway, which will connect Bergamo to Milan Malpensa airport, bypassing Milan. The consortium also includes Adanti, Grandi Lavori and Impresa Costruzioni Giuseppe Maltauro. The Pedemontana Lombarda highway project features a 65km stretch of highway extending from the Cassano Magnago autostrada (the A8) to the Osio Sotto autostrada (the A4) and includes a bypass of Como and Varese. The project also includes a 20km stretch of suburban main road, plus a series of road works that will link the new route with the local traffic network. Completion was originally planned for 2012 and the route is expected to handle 65,000 cars/day, while the total cost will be €4.3 billion including all the secondary links and additional work.

For more information on companies in this article

Related Content

  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Land acquisition delays the start of Bratislava's orbital road
    September 25, 2017
    Land acquisition issues have stalled the start of construction of Bratislava’s orbital road by up to eight months. Work could begin this autumn, according to a report by the Slovak Spectator, because the government is working on laws that would allow construction before all land is acquired.
  • Hanwha on the Pedemontana Veneta
    November 1, 2022
    The need for a motorway to link the cities of Vicenza and Treviso in northern Italy emerged in the 1970s as the Venetian countryside became increasingly urbanised. Meanwhile, the enlargement of the European Union to the east in the 1990s also brought more traffic across the region