Skip to main content

Czech roads get quality assurance

In the Czech Republic the road authorities are looking to address quality issues that have caused problems on the country’s roads and highways. The Czech Roads and Motorways Directorate (RSD) plans to check the quality of highways using vehicle-mounted scanning laser technology. This will allow RSD to launch repairs before potholes are formed.
June 25, 2012 Read time: 2 mins
In the Czech Republic the road authorities are looking to address quality issues that have caused problems on the country’s roads and highways.

The 4785 Czech Roads and Motorways Directorate (RSD) plans to check the quality of highways using vehicle-mounted scanning laser technology. This will allow RSD to launch repairs before potholes are formed.

It is estimated that costs of the repairs will be cut by 30%. RSD tried a similar method of scanning in 2006 but the project was suspended because of a lack of funding.

Meanwhile in the Czech Republic tenders worth €146.15 million are now open for bids. The bidding process was started for the 50 tenders by the RSD. Most of the tenders relate to the D1 and D3 highway project, the Prague ring road, the R6 link between Prague and Karlovy Vary and for documentation and technical supervision of the upgrade works. RSD will also spend €32.4million on the technical supervision of smaller projects in the next four years.

And construction is underway for the last section of the D8 highway through the Ceske Stredohori mountain range. The geological survey on the 12.7km road has been under way since 23 April 2012. The D8 project is expected to be completed by early 2015.

For more information on companies in this article

Related Content

  • Tender cancelled for fifth section of Moscow’s central ring road
    December 15, 2014
    Russia’s Federal Antimonopoly Service has cancelled the results of a tender for construction and maintenance of the fifth section of the central ring road in the Moscow. The FAS made the announcement following an investigation based on a complaint from Stroygazconsulting, one of Russia’s largest infrastructure construction companies. The 23-year contract was awarded to the Koltsevaya Magistral. Stroygazconsulting complained that the bids for the contract, worth nearly US$752 million, were not evaluate
  • The March of the Urban Low-emission Zone
    April 17, 2018
    Europe’s political patchwork is getting a low-emission zone overlap, according to Malcolm Kent* By now, pretty much everybody in the industry will be aware of the Low Emission Zone in London, UK. But awareness of similar European zones about to start or expand might be more patchy. The background to all of these schemes is the problem of air quality, particularly European Union rules setting limits on acceptable pollution levels. It was found some years ago that several member states’ cities, including
  • Germany’s crumbling roads costing billions
    April 21, 2025
    Germany’s crumbling roads are costing billions to repair.
  • Let’s Boogie in a new tunnel
    July 7, 2020
    The new Victory Boogie Woogie Tunnel will be the most sustainable tunnel in the Netherlands.