Skip to main content

Costly bridge link

Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.
May 30, 2012 Read time: 1 min
Costs are climbing for the proposed new bridge to link Denmark and Germany. The structure is now  expected to cost €282 million. This represents a significant increase from the €192 million estimated just 18 months ago. Meanwhile the cost of the environmental permit has also doubled.

Related Content

  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Wacker Neuson reports strong performance for second quarter
    August 8, 2017
    Compact machine specialist Wacker Neuson says that its financial results show a strong second quarter for 2017 as well as an improved outlook for 2017 as a whole. The firm says that profitability improved and has now raised its revenue forecast for the current fiscal year. The Wacker Neuson Group reported record revenue of €425.2 million for the second quarter of 2017, compared with €381.4 million for the same period in 2016. At €46.7 million, profit before interest and tax (EBIT) jumped a healthy 41 % comp
  • Brazil’s Serra do Cafezal Highway
    July 29, 2015
    Brazil's improved Mercosur route will boost capacity and cut travel time - Mauro Nogarin writes. The Régis Bittencourt Highway is one of the main access routes of the Mercosur traffic. It has a length of 400km and connects the main cities of São Paulo and Curitiba, which allows for products to enter from the southeast toward the rest of the southern part of Brazil and later transit to Argentina, Paraguay and Uruguay. Products also flow into Brazil from Mercosur through this major highway. The cost of the hi
  • Delays have hit Chile’s Chacao Bridge project
    August 28, 2013
    Delays now look likely to affect the construction programme for Chile’s Chacao Bridge project. The US$740 million bridge project, long in planning, has been delayed on previous occasions for a number of reasons. The tolled link will connect Chiloé Island with the Chilean mainland in its Region X once complete. This 2.6km link will become South America’s largest suspension bridge although its opening will reduce journey times considerably over 25-45 minutes taken by the ferries used at present to link with C