Skip to main content

Cost rise for key NZ motorway build

The cost of the 18km Puhoi-Warkworth motorway project in New Zealand has been revised up to US$1.45billion from $1.35billion. The Transport Agency has also changed the project start date to 2014. It is thought around 50 landowners will be affected by the construction of the new motorway, which will shorten journey times between Auckland and Whangarei.
May 1, 2012 Read time: 1 min
RSSThe cost of the 18km Puhoi-Warkworth motorway project in New Zealand has been revised up to US$1.45billion from $1.35billion.

The 2574 NZ Transport Agency has also changed the project start date to 2014. It is thought around 50 landowners will be affected by the construction of the new motorway, which will shorten journey times between Auckland and Whangarei.

For more information on companies in this article

Related Content

  • New functionality for infrasfructure design software
    March 20, 2012
    Chris Bradshaw, Autodesk's vice-president for the Infrastructure Solutions division spoke to World Highways. The launch of the fourth version of its Civil 3D design software early this year will see software maker Autodesk getting serious about its road and general civil engineering package. Bigger projects can be handled in the 2008 version, and a range of new functionality is being added. "Though not everything we would like yet," said Chris Bradshaw, Autodesk's vicepresident for the Infrastructure S
  • Caterpillar reports slight sales dip for full year 2014
    February 16, 2015
    Global construction equipment manufacturer Caterpillar reported full-year 2014 sales $55.184 billion, down from $55.656 billion in 2013. Caterpillar also reported fourth-quarter 2014 sales of $14.244 billion, again slightly down at 1% from $14.402 billion in the fourth quarter of 2013. The results and a continued weak to modest improvement has dampened Caterpillar’s expectation of increased sales for 2015, likely to be around $50 billion. “Overall, we had many positives and a better year in 2014 than 2013,”
  • Sand, gravel and asphalt, building Poland’s roads
    February 24, 2012
    A new quarry is producing top quality aggregates for Poland's massive road construction programme writes Claire Symes. Wakoz Beton's Glazica sand quarry in Poland is a major source of high quality sand and gravels for the Gdansk construction market. The site is modern and only opened in 2006 but Wakoz Beton has continued to invest in facilities to improve its efficiency and output quality. The installation of a CDE mobile washing plant at the site last year is allowing it to provide materials for concrete.
  • Loads better weighing with Loadrite
    January 6, 2017
    Loadrite global marketing communications manager Simon Rush says the New Zealand firm’s on-board weighing systems for construction machines have been designed with operators in mind. “They take raw data and turn it into something really easy to understand,” said Rush. “Operators are only using one button 90% of the time, which means they are more likely to take up using them.” The Loadrite X-Weigh 2350, being exhibited at INTERMAT, can track overall tonnes and tonnes per hour throughout a construction proje