Skip to main content

Colombia’s fourth generation road project tenders underway

The National Infrastructure Agency (ANI) in Colombia has opened a tender process for the first four out of 30 fourth generation road projects in the South American country. A total of US$24.75 billion (COP 44tn) is to be invested in the projects. The pre-qualified bidders will be known in around six weeks. The contracts will be awarded in September. The fourth generation road projects will be located in Costa Caribe, Valle del Cauca and Cundinamarca. They include the 164km Caqueza-La Calera-Sopo corridor, t
February 4, 2013 Read time: 1 min
The National Infrastructure Agency (ANI) in Colombia has opened a tender process for the first four out of 30 fourth generation road projects in the South American country. A total of US$24.75 billion (COP 44tn) is to be invested in the projects. The pre-qualified bidders will be known in around six weeks. The contracts will be awarded in September.

The fourth generation road projects will be located in Costa Caribe, Valle del Cauca and Cundinamarca. They include the 164km Caqueza-La Calera-Sopo corridor, the 205km Puerto Salgar-Girardot corridor, the 90km road between Jumbo and Loboguerrero, and the 152km of roads between Cartagena and Barranquilla and Malambo.

Related Content

  • Colombia picks Conconcreto companies for Bogotá-Girardot P3 deal
    August 16, 2016
    Colombia has awarded the tender for the Bogotá-Girardot public-private partnership highway expansion, involving 145km of third lanes. The national infrastructure agency (ANI) announced the winner as a consortium of units of Colombia's Conconcreto group for US$545 million. The consortia consists of Estructura Plural Vías a Girardot, made up of Industrial Conconcreto (30%) and Constructora Conconcreto (70%). The winning group beat out four other consortia, according to ANI, to building the first six-lan
  • Colombia road project tender process
    July 22, 2019
    The tender process for Colombia’s Buga-Buenaventura fourth generation (4G) toll road project is being planned. The tender for the 114.1km dual carriageway is being handled in two separate stretches however. One of the road stretches will be for a 55.4km section from Buga to Loboguerrero, which is expected to cost US$359.45 million. The 58.7km stretch from Loboguerrero to Buenaventura meanwhile is expected to cost $362.75 million. The Loboguerrero to Buenaventura section of the route includes building a 19km
  • Colombian road construction projects
    October 28, 2021
    Colombian road construction projects are being delivered.
  • Colombia tunnel construction contract commencing
    February 5, 2018
    Driving work has commenced for Colombia’s Toro Tunnel project. The tunnel will measure 9.8km long and is located in Colombia’s Antioquia Department, with the completion expected in 2022. The project is costing US$650.5 million and the link is intended to provide a link between the Autopista al Mar 1 and Autopista al Mar 2 highways. When complete the tunnel will also cut the travel time between Medellin and Uraba to four hours.