Skip to main content

China's Exim Bank to approve US$ 1.1bn to build Serbia’s Corridor 11 motorway

The Serbian government has reported that it is planning to sign a loan agreement with China's Exim Bank for new loans worth US$ 1.1 billion for construction of the Corridor 11 motorway. Minister of Finance, Mladan Dinkic, said that the loan will be used for construction of the Belgrade-Ljig and Pojate Preljina motorway parts. The contract agreement is due to be signed by the end of 2012 or beginning of 2013. Works are expected to start sometime next year.
October 2, 2012 Read time: 1 min
The Serbian government has reported that it is planning to sign a loan agreement with China's Exim Bank for new loans worth US$ 1.1 billion for construction of the Corridor 11 motorway.

Minister of Finance, Mladan Dinkic, said that the loan will be used for construction of the Belgrade-Ljig and Pojate-Preljina motorway parts. The contract agreement is due to be signed by the end of 2012 or beginning of 2013. Works are expected to start sometime next year.

Related Content

  • Financing secured for Serbian road project
    October 29, 2021
    Financing has been secured by Bechtel for a key Serbian road project.
  • Serbia projects due for completion
    December 14, 2016
    Work is pushing ahead with the construction of the Corridor 10 and Corridor 11 highway projects in Serbia. Sections of the highway projects will be opened to traffic in 2017. All of Corridor 10 will be ready for use while the Obrenovac to Preljina stretch of Corridor 11 will open. Other road projects will commence including links running through Moravski and Fruskogorski. The Serbian Government doubled its infrastructure spending to €608.14 million for 2016, with a substantial portion being provided through
  • Sofia to Belgrade in three hours
    June 15, 2020
    Serbia and neighbouring Bulgaria are hoping to agree a motorway project.
  • Slovakia, Salini Impreglio to part ways over D1-Višňové tunnel work
    March 11, 2019
    Slovakia and the Italian-Slovak consortium of Salini Impregilo and Dúha will reportedly end construction of a D1 highway stretch including the Višňové tunnel. The planned 7.5km twin-tube Višňové Tunnel is part of the 13.4km section of the D1 between Lietavská Lúčka and Dubná Skala in northern Slovakia. Work started on what will be Slovakia’s longest tunnel in in June 2015. It is also part of the Corridor 5 of the Trans-European Networks (TEN) which links Bratislava with Uzhhorod in Ukraine and is financed