Skip to main content

Cengiz Insaat wins €115mn Bosnian Suhodol-Tarcin motorway tender

Turkish company Cengiz Insaat has reportedly been awarded the €115 million contract for the construction of the Suhodol-Tarcin motorway in Bosnia. The works, which will be done in cooperation with Bosnian company Euroasfalt, will include two tunnels. One of the will be 400m long, while the other will be 2.5km. Works are expected to be completed by 2014.
August 28, 2012 Read time: 1 min
Turkish company 4144 Cengiz Insaat has reportedly been awarded the €115 million contract for the construction of the Suhodol-Tarcin motorway in Bosnia.

The works, which will be done in cooperation with Bosnian company 5741 Euroasfalt, will include two tunnels. One of the will be 400m long, while the other will be 2.5km. Works are expected to be completed by 2014.

For more information on companies in this article

Related Content

  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • Work starts on Banja Luka-Prijedor highway
    November 18, 2021
    The highway in Republika Srpska is part of the Banja Luka-Novi Grad motorway.
  • Planned Bosnia highway project on track
    August 29, 2014
    The project to construct Bosnia’s Corridor Vc highway is on track, with completion scheduled for 2020. So far some 6km of the highway has been built, which includes a 3km tunnel stretch. In all the Corridor Vc project calls for the construction of a 330km highway. The Bosnian motorway company, Autoceste Federacije BiH, has not so far revealed the cost of the project however.
  • Sava River bridge completed but not open
    August 16, 2022
    The bridge between Croatia and Bosnia will open when custom facilities are finished next year.