Skip to main content

Bulgarian plan

Greek contractor Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.
May 30, 2012 Read time: 1 min
Greek contractor 1570 Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol  and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.

For more information on companies in this article

Related Content

  • Europe’s new safety rules to cut crashes
    May 26, 2017
    A new plan will help boost road safety in Europe, with the rules governing cars and trucks being revised. The move comes following pressure from campaigning groups pushing vehicle manufacturers to equip their products with new safety systems. This move is intended to boost overall vehicle safety and cut casualties and road deaths across the EU. The draft policy document for the move has outlined a series of initiatives to be adopted this year. This will includes changes to the current vehicle safety regulat
  • Using technology so assess road surface quality
    April 4, 2014
    Advances in survey technology and the evolving face of road procurement are driving demand for highway condition data. Mark Thomas, infrastructure services manager at Fugro Aperio writes how surveys of new roads can improve long-term quality While a growing suite of non-intrusive testing, measurement and survey technologies are widely used to target highway repairs and to determine asset management strategies, the use of these powerful tools remains patchy in the early stages of the infrastructure life cycl
  • Serbia reduces cost of highway construction
    March 22, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget.
  • Headline Investing in corridors for shared prosperity
    February 27, 2015
    A major IRF regional congress is being held in Europe & Central Asia. The IRF’s global volunteer leadership invites those interested to take part in the 1st IRF Regional Congress in Europe & Central Asia held in Istanbul, on September 15-18, 2015. The European & Central Asia region is a geographic area covering 23 countries with a shared history of relatively recent transition from planned to market economies, and the profound impact this has had on trading patterns, transport services and infrastructure ne