Skip to main content

Bulgarian plan

Greek contractor Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.
May 30, 2012 Read time: 1 min
Greek contractor 1570 Aktor is currently preferred bidder for construction of Bulgaria’s new Trakia highway. This road will link Nova Zagora and Yambol  and the plan calls for the highway to be complete within a 25-month period. Apart from Aktor, bids were also submitted by ten companies.

For more information on companies in this article

Related Content

  • PTV Group retains London contract for modelling software
    October 1, 2019
    PTV Group said that it has been retained by Transport for London (TfL) as a supplier of tactical and operational modelling software.
  • Additional Romania contract for PORR
    September 16, 2021
    Austrian contractor PORR has won an additional Romanian contract, while other projects are also underway in the country.
  • Key highway sections to be completed in Serbia in 2017
    January 16, 2017
    A series of major highway sections in Serbia should be completed during 2017, including work to two stretches of the key Corridor 10 project. In all, some 122km of highways are expected to be opened to traffic in Serbia during 2017. Greek contractor Actor is building an 18km stretch of Corridor 10 that runs from Surcin to Obrenovac part. This firm is also building a 19.5km section of Corridor 10 from the Ostruznica Bridge that spans the Sava River to Bubanj Potok, and a further 10km section leading to Buban
  • Czech road plans call for major construction
    January 31, 2018
    The Czech Republic is setting out its programme to develop its road infrastructure network. The plans call for work to build 360km of roads and highways as well as maintaining existing stretches. The construction plans include work on the Prerov section of the D1 highway, a stretch of the D40 from Hulin to Frystak, the Hodejovice section of the D3 highway and the Frydek-Mistek by-pass. They also include work to two sections each of the D35 highway and D11 highway as well as a number of bypasses for the D6