Skip to main content

Bridge replacement programme for Pennsylvania

A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises Gr
October 31, 2014 Read time: 1 min
A major programme of bridge replacement works on Pennsylvania will see the state replacing 558 highway bridges over a period of three years. The work is expected to cost in the region of US$899 million to carry out and was awarded by the 2535 Pennsylvania Department of Transportation (PennDot) to a group of firms called Plenary Walsh Keystone Partners. The package of works includes construction of the bridges over three years as well as a 25 year maintenance deal. The Plenary Walsh Keystone Partners comprises 1007 Granite Construction, Walsh Group and 2418 HDR Engineering. Construction will commence in the summer of 2015 followed by completion within three years. Inclusive of financing costs, an average of $65million/year will be paid by the state under the contract's 28-year term for $1.82 billion in total.

For more information on companies in this article

Related Content

  • Ghana plans rural road development
    July 6, 2021
    Ghana is planning a programme of rural road development.
  • China's major highway investment
    March 5, 2012
    China's Shandong and Tianjing Provinces plan to boost transport links with major investment programmes in hand.
  • UGL wins Australia’s NorthConnex M&E services contract
    September 7, 2015
    Engineering services provider UGL has signed a four-year deal with the Lend Lease Bouygues joint venture that is building the NorthConnex motorway in Sydney, Australia. The US$329 million contract is for the design, procurement, construction and commissioning of the electrical, mechanical, communication, fire and control systems needed for the project’s 9km twinned tolled tunnel. UGL provides outsourced engineering, asset management and maintenance services to rail, transport, power, resources, water an
  • Finley’s triple bridge design-build success in Israel
    April 9, 2013
    Finley Engineering Group (Finley) is providing segmental bridge design and construction engineering services on three design-build projects in Israel. Road 722 is a US$68.9 million project in Haifa awarded to Danya-Cebus. The project’s twin precast segmental bridges have a total length of 314m and six spans. The Road 722 Bridge is said to be based on the same cross section and erection method that Finley developed for Danya-Cebus and used on the Road 431 project (5 bridges), the Section 18 Interchange (6 br