Skip to main content

Brazil: Phase 2 of PAC infrastructure programme shows results

Brazil has built nearly 5,200km of roads in the past four years, according to a review of the federal government's PAC Phase 2 accelerated economic growth programme. Around 1,400 of the 5,200km were built under long-term concessions and another 7,000km are under construction. Total investment has been around US$24.43 billion. PAC is a strategic investment programme that combines management initiatives and public works, according to the World Bank. The first phase, launched in 2007, saw around $349 bil
December 18, 2014 Read time: 2 mins
RSSBrazil has built nearly 5,200km of roads in the past four years, according to a review of the federal government's PAC Phase 2 accelerated economic growth programme.

Around 1,400 of the 5,200km were built under long-term concessions and another 7,000km are under construction. Total investment has been around US$24.43 billion.

PAC is a strategic investment programme that combines management initiatives and public works, according to the World Bank. The first phase, launched in 2007, saw around $349 billion set aside for approved projects under PAC.

Similar to the first phase, PAC 2 focuses on investments in logistics, energy and social development, organised under six major initiatives: Better Cities (urban infrastructure); Bringing Citizenship to the Community (safety and social inclusion); My House, My Life (housing); Water and Light for All (sanitation and access to electricity); Energy (renewable energy, oil and gas); and Transportation (highways, railways, airports).

But some of Brazil's highways projects have hit financial snags, as 3260 World Highways reported in December.

In Minas Gerais state, 7052 Banco do Brasil is holding back funds for planned work. As a result the state government has halted work on 32 construction projects. The Banco do Brasil has not provided the expected $346 million for the work. Projects include a section of the MG-437 road between Sabara and Nova Lima. The Banco do Brasil said it may, however, release the sum in 2015.

For more information on companies in this article

Related Content

  • New Zealand: 10-year plan sets out road infrastructure spending
    December 19, 2014
    New Zealand will spend US$30 billion over the next decade on public transport, including road works not just in major urban areas but in the provinces. The announcement was made by Transport Minister Simon Bridges after the government approved the draft Government Policy Paper 2015. The approved document takes into consideration concerns by local government that their transport infrastructure needs would be ignored in favour of those for large urban areas, the New Zealand Herald newspaper reported.
  • Safer Roads: More Than Just Progress on Paper
    June 8, 2016
    As the co-chairman of Pillar II (“Safer roads and mobility”) of the United Nations Road Safety Collaboration, I was privileged to be in New York on April 15, 2016 as the United Nations General Assembly adopted a resolution on “improving global road safety” sponsored by 56 UN member states. By a bitter twist of fate, this resolution came to pass as many countries around the world are reporting a notable increase in injuries and deaths on their roads, including in countries that had seen a steady decline
  • Road safety improvements for Brazil
    August 23, 2021
    Road safety improvements are planned for Brazil.
  • Tecnoidea’s high-beam design eases filter changes
    January 6, 2017
    Tecnoidea has introduced a plate press filtration plant with high-beam design, which is capable of working at pressures up to 16bar and said to speed the location of and replacement of breached filters. The modular design can have up to 100 pairs of filters to cope with flows up to 9,000lit/min and each pair has an individual drain, making it easier to locate breached filters. For ease and speed of replacing breached filter material, the high-beam design incorporates a handling system to remove the relevant