Skip to main content

Brazil: Phase 2 of PAC infrastructure programme shows results

Brazil has built nearly 5,200km of roads in the past four years, according to a review of the federal government's PAC Phase 2 accelerated economic growth programme. Around 1,400 of the 5,200km were built under long-term concessions and another 7,000km are under construction. Total investment has been around US$24.43 billion. PAC is a strategic investment programme that combines management initiatives and public works, according to the World Bank. The first phase, launched in 2007, saw around $349 bil
December 18, 2014 Read time: 2 mins
RSSBrazil has built nearly 5,200km of roads in the past four years, according to a review of the federal government's PAC Phase 2 accelerated economic growth programme.

Around 1,400 of the 5,200km were built under long-term concessions and another 7,000km are under construction. Total investment has been around US$24.43 billion.

PAC is a strategic investment programme that combines management initiatives and public works, according to the World Bank. The first phase, launched in 2007, saw around $349 billion set aside for approved projects under PAC.

Similar to the first phase, PAC 2 focuses on investments in logistics, energy and social development, organised under six major initiatives: Better Cities (urban infrastructure); Bringing Citizenship to the Community (safety and social inclusion); My House, My Life (housing); Water and Light for All (sanitation and access to electricity); Energy (renewable energy, oil and gas); and Transportation (highways, railways, airports).

But some of Brazil's highways projects have hit financial snags, as 3260 World Highways reported in December.

In Minas Gerais state, 7052 Banco do Brasil is holding back funds for planned work. As a result the state government has halted work on 32 construction projects. The Banco do Brasil has not provided the expected $346 million for the work. Projects include a section of the MG-437 road between Sabara and Nova Lima. The Banco do Brasil said it may, however, release the sum in 2015.

For more information on companies in this article

Related Content

  • Tecnoidea’s high-beam design eases filter changes
    April 17, 2013
    Tecnoidea has introduced a plate press filtration plant with high-beam design, which is capable of working at pressures up to 16bar and said to speed the location of and replacement of breached filters. The modular design can have up to 100 pairs of filters to cope with flows up to 9,000lit/min and each pair has an individual drain, making it easier to locate breached filters. For ease and speed of replacing breached filter material, the high-beam design incorporates a handling system to remove the relevant
  • Colombian infrastructure projects boost
    February 22, 2022
    Colombian infrastructure projects will be boosted with new budget.
  • Book highlights infrastructure need for US
    November 17, 2015
    A new book by US domestic policy expert James P Pinkerton reveals that investing in transportation infrastructure will build America’s economic strength. In A Vision of American Strength: How Transportation Infrastructure Built the United States, Pinkerton observes that “the history of civilisation is the history of infrastructure.” He explains how societies have flourished as they developed better roads and other transportation systems. Pinkerton details how transport infrastructure fuelled the growth of
  • Caterpillar’s 2016 results reflect tough market conditions
    January 31, 2017
    Caterpillar’s financial results for 2016 reflect the tough trading conditions that US construction machine firms in particular have been experiencing. In another development, the firm is looking to move its global corporate headquarters from Peoria to Chicago.