Skip to main content

Botswana bridge deal for Italian contractors

Two Italian contractors will handle a bridge project in Botswana. The US$93 million project will be carried out by a joint venture comprising the construction firm Cimolai and Itinera. The 1.1km-long bridge is to be built in Botswana’s Okavango Delta, providing a new link for vehicles and pedestrians. The new bridge will replace an existing link built on pontoons and is expected to open to traffic in 2019. The Okavango Delta is a large and swampy area of the country that experiences seasonal flooding and wh
January 18, 2017 Read time: 2 mins
Two Italian contractors will handle a bridge project in Botswana. The US$93 million project will be carried out by a joint venture comprising the construction firm Cimolai and Itinera. The 1.1km-long bridge is to be built in Botswana’s Okavango Delta, providing a new link for vehicles and pedestrians. The new bridge will replace an existing link built on pontoons and is expected to open to traffic in 2019. The Okavango Delta is a large and swampy area of the country that experiences seasonal flooding and which covers some 15,000km2. The delta is famed for its wildlife and though remote, provides a major draw for tourists to Botswana. Providing a new bridge will help boost the tourist trade and further develop Botswana’s economy. An environmental assessment has been carried out to ensure that the project will not impact on the local ecosystem and the joint venture partners will build the link according to necessary requirements.

Related Content

  • London Lower Thames Crossing link
    October 10, 2018
    Progress is being made with regard to the proposed Lower Thames Crossing project close to London.
  • Storstrøm Bridge JV asks for extension
    July 13, 2023
    The original estimated cost was around €280 million for the 4km cable-stay structure when the contract was awarded by the Danish Road Directorate (Vejdirektoratet).
  • How Hitex changed its products to meet the demands of India’s roads
    December 7, 2016
    The Indian Government is keen to embrace new technologies and ideas from overseas but as Hitex International discovered, Indian roads need very special products - Kristina Smith reports
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci