Skip to main content

Botswana bridge deal for Italian contractors

Two Italian contractors will handle a bridge project in Botswana. The US$93 million project will be carried out by a joint venture comprising the construction firm Cimolai and Itinera. The 1.1km-long bridge is to be built in Botswana’s Okavango Delta, providing a new link for vehicles and pedestrians. The new bridge will replace an existing link built on pontoons and is expected to open to traffic in 2019. The Okavango Delta is a large and swampy area of the country that experiences seasonal flooding and wh
January 18, 2017 Read time: 2 mins
Two Italian contractors will handle a bridge project in Botswana. The US$93 million project will be carried out by a joint venture comprising the construction firm Cimolai and Itinera. The 1.1km-long bridge is to be built in Botswana’s Okavango Delta, providing a new link for vehicles and pedestrians. The new bridge will replace an existing link built on pontoons and is expected to open to traffic in 2019. The Okavango Delta is a large and swampy area of the country that experiences seasonal flooding and which covers some 15,000km2. The delta is famed for its wildlife and though remote, provides a major draw for tourists to Botswana. Providing a new bridge will help boost the tourist trade and further develop Botswana’s economy. An environmental assessment has been carried out to ensure that the project will not impact on the local ecosystem and the joint venture partners will build the link according to necessary requirements.

Related Content

  • Oman deal for Turkish/Italian partners
    February 9, 2012
    The first phase of Oman's new Sur road project is now being carried out by a joint venture comprising Turkish contractor Ozkar Insaat (Ozkar) and Italian firm Astaldi.
  • Tunnel technology improves driving safety
    February 14, 2012
    Tunnel technology advances will make driving through underground links considerably safer, writes Mike Woof
  • Major Russian bridge projects underway
    December 13, 2017
    A series of major bridge projects are underway in Russia, in the Krasnodar Region, Novosibirsk and the Surgut District. A new bridge being built in the Krasnodar Region is expected to be open to vehicle traffic at the end of 2018. Work on the bridge supports is being completed at present and work on the deck is now underway. The bridge will also carry rail traffic from the end of 2019. Meanwhile in Novosibirsk, construction is commencing on a new bridge spanning the Ob River. This will be the fourth bridge
  • The doors open on a record-breaking bauma China 2018
    November 22, 2018
    You can tell a lot from numbers – and this year’s bauma China exhibition is set to be a record-breaker! The exhibitor numbers represent an impressive 11% increase on the 2,958 exhibitors from 41 countries that presented their products and innovations to around 170,000 visitors at the 2016 event.