Skip to main content

Bid to solve pothole problem

The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete. It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists. Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles. The new l
July 3, 2012 Read time: 2 mins
Road repairs not properly carried out increase the risk of potholes forming. This pothole, showing exposed wires to the traffic lights, is on a busy London road
The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete.

It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists.

Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles.

The new legislation is intended to reduce the chances of potholes developing as well as cutting down the risk that the road will have to be replaced a second time.

The UK government has set out a package of measures over the last nine months to reduce disruption caused by road works. These include proposals to increase the charges for companies whose works overrun by a factor of ten, as well as to improve signage and protection of sites and for a tougher street works inspection regime. In addition, the 5432 Department for Transport has introduced more rigorous testing and training for those who dig up the road as well as approving the first two street works permit schemes to help councils coordinate and manage works on their roads.

For more information on companies in this article

Related Content

  • Use 3D modelling to advance sustainable highway construction best practices
    April 30, 2025
    When it comes to advancing highway sustainability, the role of 3D modeling and digital technologies in road construction is becoming ever-more important. Anna Liza Montenegro, director of marketing at Microsol Resources explains why your business needs to get involved now.
  • Repair, recycling and warm mix technology at Italy’s Asphaltica exibition
    May 15, 2017
    As the name might suggest, the Asphaltica show in Verona, Italy was a good place to catch up on new ideas and applications for bitumen technology. Kristina Smith picked out a few highlights.
  • Efficient processing of RAP in the mix
    December 19, 2017
    There are important methods aimed at the reuse and recycling of reclaimed asphalt pavement (RAP) a number of problems have to be solved however, mainly concerning the elimination of moisture content and how best to heat the RAP without damaging the binder. When RAP is used in percentages of up to 30-40% of the final mix, heating can be carried out through direct contact with hot aggregates. On the other hand, in order to use higher RAP percentages, up to 100%, the plant has to be fitted with a specific h
  • HCME's new parts depot
    April 11, 2012
    The new Hitachi Construction Machinery (Europe)/HCME European Parts Depot has been officially opened. At the Oosterhout facility, southern Netherlands, the guest of honour was Hitachi Construction Machinery president Michijiro Kikawa, who gave a speech to other guests at the ceremony, among them Mitsuhiro Tabei, president of HCME. He then presented representatives from the parts depot with a special Japanese maple tree, which was planted in front of the building. In his address, Mr Kikawa emphasised the imp