Skip to main content

Bid to solve pothole problem

The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete. It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists. Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles. The new l
July 3, 2012 Read time: 2 mins
Road repairs not properly carried out increase the risk of potholes forming. This pothole, showing exposed wires to the traffic lights, is on a busy London road
The UK now has new guidance designed to ensure that when utilities companies dig up the road surface, they leave proper repairs once the work is complete.

It is estimated that poorly replaced road surfaces mean there are around 90,000 remedial works each year, adding inconvenience to motorists and cyclists.

Many of the road repairs are not properly carried out, increasing the risk of potholes forming and further defects. This significantly increases the risk of accidents and of damage to vehicles.

The new legislation is intended to reduce the chances of potholes developing as well as cutting down the risk that the road will have to be replaced a second time.

The UK government has set out a package of measures over the last nine months to reduce disruption caused by road works. These include proposals to increase the charges for companies whose works overrun by a factor of ten, as well as to improve signage and protection of sites and for a tougher street works inspection regime. In addition, the 5432 Department for Transport has introduced more rigorous testing and training for those who dig up the road as well as approving the first two street works permit schemes to help councils coordinate and manage works on their roads.

For more information on companies in this article

Related Content

  • HCME's new parts depot
    February 17, 2012
    The new Hitachi Construction Machinery (Europe)/HCME European Parts Depot has been officially opened. At the Oosterhout facility, southern Netherlands, the guest of honour was Hitachi Construction Machinery president Michijiro Kikawa, who gave a speech to other guests at the ceremony, among them Mitsuhiro Tabei, president of HCME. He then presented representatives from the parts depot with a special Japanese maple tree, which was planted in front of the building.
  • HCME's new parts depot
    February 17, 2012
    The new Hitachi Construction Machinery (Europe)/HCME European Parts Depot has been officially opened. At the Oosterhout facility, southern Netherlands, the guest of honour was Hitachi Construction Machinery president Michijiro Kikawa, who gave a speech to other guests at the ceremony, among them Mitsuhiro Tabei, president of HCME. He then presented representatives from the parts depot with a special Japanese maple tree, which was planted in front of the building. In his address, Mr Kikawa emphasised the imp
  • A new study is being carried out for a proposed bridge project for the UK’s Thames River
    April 4, 2012
    Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
  • Australia responds to infrastructure funding challenge
    July 13, 2012
    The Global Financial Crisis (GFC) has drastically changed the way governments and the private sector is prepared to procure vital infrastructure projects, says Philip Davies Governments have responded to the GFC by focusing on long term investment in transport infrastructure and shorter term stimulus packages to kick-start economies. As these projects proceed, the focus will shift to maintaining and achieving maximum benefits from assets and future infrastructure funding. The Public Private Partnership (PP