Skip to main content

Bentley Systems partners with Google

Bentley Systems is partnering with Google to deliver more efficient use of data.
By MJ Woof October 10, 2024 Read time: 2 mins
A 3D aerial view of Vancouver city, displaying detailed buildings and landscape, enabled by Cesium technology, integrated with iTwin from Bentley Systems

Bentley Systems has announced a strategic partnership with Google. This will integrate Google’s geospatial content with Bentley’s infrastructure engineering software and digital twin platform to improve the way infrastructure is designed, built, and operated.

Leveraging the engineering data created and managed in Bentley software alongside Google’s geospatial data, AI and analytics, and cloud technologies, engineers can design and manage infrastructure in context and at scale to address today’s most urgent challenges, from mitigating climate risk to maintaining ageing infrastructure.

Nicolas Cumins, CEO of Bentley commented, “What Google has done is create a digital twin of planet Earth.

Through the partnership, Bentley software users and developers can use the geospatial content from Google Maps Platform for real-world geospatial context and immersive 3D experiences in digital workflows. The partnership complements Bentley’s recent acquisition of Cesium, the foundational open platform for creating powerful 3D geospatial applications. Cesium is the creator of the 3D Tiles open standard used by Google. Bentley is also collaborating with Google Cloud to deliver AI-driven insights for asset analytics.

Cumins said, “By combining Google’s extensive geospatial content and cloud capabilities with Bentley’s infrastructure engineering software and digital twin platform, infrastructure professionals can improve their work and ensure projects and assets are created and operated with greater resilience and sustainability. This partnership demonstrates how open standards, such as 3D Tiles, can help infrastructure professionals evolve their practices by leveraging the power of geospatial context.”

Chris Phillips, vice president and general manager of Geo at Google, commented, “Photorealistic 3D Tiles in Google Maps Platform power breathtaking immersive experiences and can transform workflows for architects, engineers, and urban planners. We’re excited to partner with Bentley to bring powerful geospatial context and capabilities that can dramatically improve how infrastructure is designed, built, and operated with data.”

For more information on companies in this article

Related Content

  • Bentley’s OpenRoads Designer CONNECT Edition Advances Roadway Projects
    November 15, 2016
    OpenRoads’ Comprehensive Modeling Environment Leverages BIM Advancements to Empower Project Delivery LONDON – The Year in Infrastructure 2016 Conference – 1 November 2016 – Bentley Systems, Incorporated, a leading global provider of comprehensive software solutions for advancing infrastructure, today announced that OpenRoads Designer CONNECT Edition will be available for Early Access on December 1, 2016.
  • Bentley’s OpenBridge for Cebu-Cordova link
    February 7, 2024
    The OpenBridge software solution from Bentley Systems played a key role in the development of the Cebu-Cordova bridge project in the Philippines.
  • Digital Twins Generate Real-World ROI
    June 1, 2022
    Digital Twins Are Going Mainstream in the Transportation Industry
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.