Skip to main content

Bentley announces finalists for the 2017 Be Inspired Awards

AECOM, Arcadis-WSP/PB, CH2M-Fairhurst and Highways England are among the finalists for this year’s Bentley awards for outstanding use of BIM – building information modelling. Bentley Systems, a provider of infrastructure software solutions, said that the winners will be announced at The Year in Infrastructure 2017 Conference to be held in Singapore this year, October 10-12. “The annual awards honour the extraordinary work of Bentley users advancing infrastructure design, construction, and operations through
August 11, 2017 Read time: 3 mins
The twin-span Tappan Zee Hudson River Crossing – officially the Governor Mario M. Cuomo Bridge – was a Bentley winner in 2014 and will open fully next year (photo: New York State Thruway Authority)
1397 AECOM, Arcadis-2782 WSP/PB, 2874 CH2M-Fairhurst and 8100 Highways England are among the finalists for this year’s Bentley awards for outstanding use of BIM – building information modelling.

4019 Bentley Systems, a provider of infrastructure software solutions, said that the winners will be announced at The Year in Infrastructure 2017 Conference to be held in Singapore this year, October 10-12.

“The annual awards honour the extraordinary work of Bentley users advancing infrastructure design, construction, and operations throughout the world,” the company said.

Ten independent jury panels of industry experts selected the 51 finalists from more than 400 nominations submitted by organisations in more than 50 countries.

Finalists will present their innovative projects to their peers, the jurors, industry thought leaders and more than 120 members of the media as part of related infrastructure forums at the conference to take place at the Marina Bay Sands Expo and Convention Centre. The structural design of Marina Bay Sands was done by 1419 Arup and was Bentley’s 2010 Be Inspired Award winner for Innovation in Structural Engineering.

Highways and road infrastructure projects and companies feature in many of the categories:

BIM Advancements in Bridges:

  •  AECOM – Pearl Harbor Memorial Bridge – (New Haven, Connecticut, United States)
  •  Arcadis-WSP/PB Joint Venture– Citylink Tulla Widening– (Melbourne, Victoria, Australia)
  • Long Jian Road & Bridge Co., Ltd. – Heihe - Blagoveshchensk Heilongjiang River (Amur River) Road Bridge Project– (Heihe City, Heilongjiang Province, China)
BIM Advancements in Construction: among the finalists is…
  • Leighton Asia – Hong Kong Boundary Crossing Facilities, Hong Kong-Zhuhai-Macao Bridge – (Hong Kong)
BIM Advancements in Reality Modeling: among the finalists are…
  • CEDD-AECOM-The Earth Solutions – Development of Anderson Road Quarry Site – (Hong Kong)
  • The Sanborn Map Company, Inc. – Sanborn3D HD Maps for Autonomous Driving: Santa Clara – (Santa Clara County, California, United States)
BIM Advancements in Roads:
  • AECOM (Poland) – Road Design and Interdisciplinary Coordination of the E10 Avvakko-Lappeasuando Project – (Gällivare kommun, Norrbottens län, Sweden)
  • CCCC First Highway Consultants Co., Ltd. – Application of BIM Strategy on the Transformation of Meiguan Expressway to Urban Road Design Project – (Shenzhen City, Guangdong Province, China)
  • CH2M Fairhurst JV – A9 Dualling - Glen Garry to Dalraddy – (Dalwhinnie, Highlands, United Kingdom)
BIM Advancements in Road and Rail Asset Performance:
  • 2555 New Jersey Department of Transportation (NJDOT) – NJDOT / Public Private Partnership of a Bentley-Hosted SUPERLOAD System for Oversize / Overweight Vehicle Permitting and Routing – (Trenton, New Jersey, United States)
  • 2648 Oregon Department of Transportation – TransInfo – A Connected Data Environment for Transportation – (Salem, Oregon, United States)
  • Highways England – Network Occupancy Management System (NOMS) – (Strategic Road Network, England, United Kingdom)
In 2014, the Advancing Comprehensive BIM award was taken by engineering design firm 2418 HDR for its Tappan Zee Hudson River Crossing, the New NY Bridge in the US. It was renamed this summer the Governor Mario M. Cuomo Bridge, of which the first span will open to westbound traffic later this month.
The original bridge is in Westchester across the Hudson River at one of its widest points. But the 27m-wide cantilever structure is pushing 60 years old, well past its 50-year expectancy and carrying around 138,000 vehicles daily.

In 2013, the New York State Thruway Authority and Tappan Zee Constructors started the US$3.9 billion eight-lane bridge, a double-span design of four lanes per span in opposite directions. It’s also designed to take a rapid transit rail line between the two road decks in future without major reinforcing or widening.

For additional information about The Year in Infrastructure 2017 Conference or to register, click %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal here The Year in Infrastructure 2017 Link false https://www.bentley.com/en/yii/home true false%>.

Follow Bentley on Twitter @bentleysystems and follow the news leading up to the event using hashtags: #YII2017 and #GoingDigital.

Like Bentley Systems on %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Facebook Bentley Facebook false https://facebook.com/bentleysystems true false%> and follow the company on LinkedIn.

For more information on companies in this article

Related Content

  • VIDEO: Broadway Bridge defies demolition experts, for a time
    October 12, 2016
    A 100-year old steel arch bridge in the United States stood firm for a time against the blasts laid down by demolition experts.

    The structure connected the cities of Little Rock and North Little Rock in the state of Arkansas. It carried U.S. Route 70 but was finally closed on 28 September.

    Although Broadway Bridge, spanning the Arkansas River, was built almost a century ago, the steel arches were added 60 years later as part of a strengthening project to the under-structure to widen the river navigation channel.
  • IRF Geneva carries out road statistics seminar
    June 28, 2013
    IRF Geneva has carried out a successful webinar on World Road Statistics for Beginners - Techniques and Methods. Participants from all over the world joined in to the key messages and techniques from this webinar. This addressed the core characteristics of raw data brought together in the annual World Road Statistics report, which is one of IRF’s flagship projects. Published since 1964, this publication remains the single comprehensive source of data for the international road, traffic and transport sectors
  • Bolivia starts on Apolo Charasani section of La Paz road
    October 31, 2014
    Bolivia has started work on the new northern La Paz road, a five-year, US$250 million project. Work is underway on the first section, known as Apolo Charasani, while the second section, called Charasani-Escoma, is still under analysis. World Highways reported in September that Bolivia planned to invest nearly $510 million for road building works. The country’s state-run road company, Administradora Boliviana de Carreteras, said 32 road maintenance and construction projects stretching for 5,773km in Sant
  • More demonstrations, more exhibitors at PLANTWORX 2017 in the UK
    January 26, 2017
    The 3rd biennial PLANTWORX Construction Machinery exhibition in the UK is on target to exceed the number of exhibitors at the last show in 2015. With five months to go before opening, 278 exhibitors have signed up, making 86% of exhibition spaces sold, according to the organisers. Of the 278 exhibitors, 74 are new to the event which is hosted the CEA - the UK’s Construction Equipment Association. The biennial event will take place at its established home at Bruntingthorpe Proving Ground in Leicestersh