Skip to main content

Bell’s new logistics facility to ensure ultra-quick replacement ADT parts for customers

Bell customers across Europe are to receive their replacement articulated dump truck parts quicker than ever before after the South African hauling giant completes its new giant logistics facility in Germany.
January 6, 2017 Read time: 2 mins
Marc Schürmann, Bell’s European managing director, has revealed company plans for a new larger European logistics centre
1240 Bell customers across Europe are to receive their replacement articulated dump truck parts quicker than ever before after the South African hauling giant completes its new giant logistics facility in Germany.

Marc Schürmann, Bell’s Europe managing director, told The Daily News that the new facility in Alsfeld, central Germany, will be 12,000m², compared to the current 7,000m² facility on an adjacent site.

“It’s on the cusp of two north, south, east and west autobahn crosses in Germany. The location almost right in the centre of Germany. It’s an hour’s drive from Frankfurt, so we can have a parts pick up late afternoon, get it on the plane at night, and deliver it to the customer or dealer the very next morning.

“With the changes to the E-Series, we bought additional property and aim to do a green field development of a new facility that will be ultra-modern and have all the latest technology. From that facility we hope to deliver 24-hours-a-day.”

Bell’s final assembly facility for the Northern Hemisphere is also only one hour’s drive from Alsfeld in Eisenach – near the former East German border.

Schürmann also said that Bell was planning to bring a 60 tonne E-Series ADT onto the market by the end of next year, following the launch later in 2015 of its 50 tonne payload B50E model – a prototype of which has been exhibited this week at INTERMAT 2015. The B50E is equipped with a Stage IV/Tier 4 Final emissions compliant MTU 6R1300 engine.

“The B50E offers a five per cent improvement on fuel efficiency than our other ADTs, due to the latest engine technology on the model. We also focus on every component to give us the best weight to performance benefit, which sets us apart from many of our competitors. We are not bound to use the in-house engine, transmission or axles. We can go out and find the best trucking application.”

Schürmann said Bell expect the B50E to sell well in the UK, and the firm is looking to increase its overall range sales in the large Scandinavian quarrying sector, as well as in high growth potential territories such as North Africa, Turkey and Russia.

For more information on companies in this article

Related Content

  • XCMG is widening its already extensive model range with the addition of new machines
    October 16, 2013
    From XCMG comes an array of new machines for loading and hauling as well as road construction. Designed for the domestic market, the LW800K LNG is a 28.5tonne wheeled loader powered by a 257kW Weichai diesel and using LNG as fuel. Twin 500litre gas tanks sit just behind the cab and the machine is suited to duties in sites where emissions may be an issue. The machine features ZF axles and a ZF transmission. Standard bucket size is 4.5m3 and it can carry an 8tonne load. This is the latest addition to the fi
  • Terex Trucks steps forward with the new TA400 ADT
    April 15, 2016
    Terex Trucks has used bauma 2016 to launch its new Stage IV-compliant TA400 ADT. Weighing in at 38tonnes, the TA400 is the first and the largest of the company’s new generation 10 articulated dump trucks. The Volvo CE-owned manufacturer has added a new cab and the Scania engine uses the latest generation Selective Catalytic Reduction.
  • Doka lays foundation stone for new logistics centre
    July 15, 2013
    Globally renowned formwork technology firm Doka has laid the foundation stone for its new logistics centre for Germany. The new 11.4 hectare facility, being built within an industrial estate on the B 87 highway near the town of Apolda in Thuringia, is earmarked for completion by the end of this year. The first phase will initially create around 40 new jobs. The Doka Group is investing around US$18.28 million (€14mn) in this initial phase, as part of the ongoing development of its worldwide distribution and
  • 2-4 year-old construction equipment tops buyer ‘wish list’
    May 11, 2012
    A leading used construction equipment auctioneer firm boss believes equipment aged between 2 and 4 years is now topping buyers’ ‘wish lists’, as 1 to 2-year-old used stocks deplete. Jonnie Keys, General Manager of Euro Auctions, said that with the cost of new equipment currently up by around 20% on prices in June 2009, the used market is still strong. “Euro Auctions has repeatedly seen over 30% of all plant sold leaving the UK and Europe for projects in Australia, South Africa, South America, Central Ameri