Skip to main content

Belize temple damaged by road builders

Criminal charges are being considered against a road contractor in Belize following extensive damage to a Mayan pyramid. The company has been accused of using rock from the 2,300 old Mayan pyramid as aggregate for a road project. Situated on private land the Nohmul complex is in the north of the Central American country and lies close to its border with Mexico. The company allegedly used excavators to remove rock from the 30m high historic temple with the material then being crushed for use as aggregate. Ar
May 16, 2013 Read time: 2 mins
Criminal charges are being considered against a road contractor in Belize following extensive damage to a Mayan pyramid. The company has been accused of using rock from the 2,300 old Mayan pyramid as aggregate for a road project. Situated on private land the Nohmul complex is in the north of the Central American country and lies close to its border with Mexico. The company allegedly used excavators to remove rock from the 30m high historic temple with the material then being crushed for use as aggregate. Archeologists in Belize have said they are horrified at this destruction and have pointed out that the temple is well-known in the area and said it is hard to believe that the construction firm could have been unaware of its historic importance. As historic structures are protected by law in Belize the company will face charges for what at best was an extremely careless act of vandalism. Construction companies in other countries regularly have to contend with archeological artifacts and procedures are in place to ensure work can carry on while historic sites are protected. In countries with a long history of civilisation such as China, Greece, Israel, Italy, Sri Lanka and Turkey, sites of archeological importance are often found during road construction work. Strict laws ensure that these areas are not damaged however.

Related Content

  • Silk Road: 'viable alternative'
    April 4, 2012
    The final results of the International Road Transport Union's (IRU) New Eurasian Land Transport Initiative (NELTI)-Phase 2 have confirmed road trade links between Europe and Asia as an economically-attractive and viable alternative to traditional, saturated maritime trading routes. This was unveiled at the recent 6th IRU Euro-Asian Road Transport Conference and Ministerial Meeting held in Tbilisi, the Georgian capital, which concluded that removing the remaining procedural impediments at borders and deve
  • Silk Road: 'viable alternative'
    May 2, 2012
    The final results of the International Road Transport Union's (IRU) New Eurasian Land Transport Initiative (NELTI)-Phase 2 have confirmed road trade links between Europe and Asia as an economically-attractive and viable alternative to traditional, saturated maritime trading routes. This was unveiled at the recent 6th IRU Euro-Asian Road Transport Conference and Ministerial Meeting held in Tbilisi, the Georgian capital, which concluded that removing the remaining procedural impediments at borders and deve
  • Silk Road: 'viable alternative'
    February 17, 2012
    The final results of the International Road Transport Union's (IRU) New Eurasian Land Transport Initiative (NELTI)-Phase 2 have confirmed road trade links between Europe and Asia as an economically-attractive and viable alternative to traditional, saturated maritime trading routes.
  • Washed to perfection
    July 16, 2012
    Ever tightening aggregate specifications for road surfacing materials is driving more quarries to wash their materials. Claire Symes looks at the technology and the implications for the industry Stricter aggregates specifications for both asphalt and concrete surfacing materials and the need to make the best use of all extracted material is driving greater use of washing equipment in the quarrying industry. But the latest washing and recycling technology means that this growth does not have to significantly