Skip to main content

Belize temple damaged by road builders

Criminal charges are being considered against a road contractor in Belize following extensive damage to a Mayan pyramid. The company has been accused of using rock from the 2,300 old Mayan pyramid as aggregate for a road project. Situated on private land the Nohmul complex is in the north of the Central American country and lies close to its border with Mexico. The company allegedly used excavators to remove rock from the 30m high historic temple with the material then being crushed for use as aggregate. Ar
May 16, 2013 Read time: 2 mins
Criminal charges are being considered against a road contractor in Belize following extensive damage to a Mayan pyramid. The company has been accused of using rock from the 2,300 old Mayan pyramid as aggregate for a road project. Situated on private land the Nohmul complex is in the north of the Central American country and lies close to its border with Mexico. The company allegedly used excavators to remove rock from the 30m high historic temple with the material then being crushed for use as aggregate. Archeologists in Belize have said they are horrified at this destruction and have pointed out that the temple is well-known in the area and said it is hard to believe that the construction firm could have been unaware of its historic importance. As historic structures are protected by law in Belize the company will face charges for what at best was an extremely careless act of vandalism. Construction companies in other countries regularly have to contend with archeological artifacts and procedures are in place to ensure work can carry on while historic sites are protected. In countries with a long history of civilisation such as China, Greece, Israel, Italy, Sri Lanka and Turkey, sites of archeological importance are often found during road construction work. Strict laws ensure that these areas are not damaged however.

Related Content

  • Winter maintenance challenge
    February 29, 2012
    Many countries had their most severe winter for years, but it could have been much worse without the right equipment and technology as Patrick Smith reports. As many countries faced up to the 2010-2011 winter, hard-pressed maintenance teams did their best to keep things moving on the roads. With some of the lowest temperatures and heaviest snowfalls on record, the UK, Republic of Ireland, Switzerland, France, Scandinavia, Germany, and Belgium were among those affected. Russia, eastern Europe and the USA did
  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.
  • Long reach equipment simplifies demolition
    April 13, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life. Many of the ultra long boom machines are designed
  • Chinese road building with Caterpillar excavators
    March 24, 2017
    A contractor in China is using specially modified excavators to carry out key tasks for road construction work The firm has acquired a number of Caterpillar excavators that have been supplied in adapted form for the project. The company is working on a contract to carry out work on a 4km road project in Nanning Road, Tianfu New District in Chengdu City. Nanning Road is located in a mountainous area and the ground conditions are challenging, with a great deal of hard rock present. Typically, this type