Skip to main content

Azerbaijan loan for Belgrade-South Adriatic motorway

The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway. The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company Azvirt
May 2, 2012 Read time: 1 min
The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway.

The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company 5414 Azvirt along with several Serbian construction firms.

For more information on companies in this article

Related Content

  • Highway developments to boost east-west transport
    April 4, 2012
    Huge highway developments are being planned and carried out to further improve East-West transport, with Central Asia a key region as Patrick Smith reports History was made in late 2010, when one of the biggest road building projects ever envisaged in Eastern Europe was given the green-light. It was the occasion when Russian president Dmitry Medvedev signed a law that would allow his country to build its segment of a huge highway around the Black Sea. The idea is to complete the 7,140km highway, wi
  • Serbia projects due for completion
    December 14, 2016
    Work is pushing ahead with the construction of the Corridor 10 and Corridor 11 highway projects in Serbia. Sections of the highway projects will be opened to traffic in 2017. All of Corridor 10 will be ready for use while the Obrenovac to Preljina stretch of Corridor 11 will open. Other road projects will commence including links running through Moravski and Fruskogorski. The Serbian Government doubled its infrastructure spending to €608.14 million for 2016, with a substantial portion being provided through
  • Plans are moving ahead on the new Argentina-Chile tunnel
    June 24, 2013
    Plans are progressing with regard to the Agua Negra tunnel that will connect Argentina and Chile and is expected to cost in excess of US$850 million. The authorities in San Juan province are calling for proposals to construct the tunnel and have published the terms and conditions for the tender. Those interested in the project will have to submit their proposals before 4th October 2013. A number of companies have shown an interest in the project including firms from Brazil, China, Germany, South Korea, Swit
  • Polish road works continue for STRABAG
    March 1, 2022
    Work on a Polish road project continues for STRABAG.