Skip to main content

Azerbaijan loan for Belgrade-South Adriatic motorway

The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway. The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company Azvirt
May 2, 2012 Read time: 1 min
The President of Azerbaijan, Ilham Alijev, has reportedly approved an agreement that will see Serbia receive US$407.75million for the construction of a section of the Belgrade to South Adriatic motorway.

The loan for the motorway section between Ljig and Preljina will be repayable over a 15 year period, with a grace period of three years and a fixed interest rate of 4%. The construction project, which will include five tunnels and over 60 bridges, will be carried out by the Azerbaijan-based company 5414 Azvirt along with several Serbian construction firms.

For more information on companies in this article

Related Content

  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Japanese loan aiding Nepalese tunnel project
    March 24, 2015
    The Nepalese Government is to receive a loan from the Japanese International Cooperation Agency (JICA) for a key tunnel project. The JICA loan is being offered at an interest rate of 1% for the next 40 years. The project is expected to cost in the region of US$150.1 million to construct. The new link will reduce traffic congestion on the existing Nagdhunga-Thankot road. Work is expected to commence in the next 18 months. The survey for the 2.5km tunnel has been carried out by the Department of Roads.
  • Harare’s US$400mn road rehabilitation deal
    March 13, 2014
    Councillors in Zimbabwe’s capital Harare have approved final details of the council's joint venture agreement with South African company Neo Capital for major roads' maintenance and rehabilitation in the city. A special purpose vehicle (SPV) named Harare Roads Development Company will be established between Neo Capital and Harare. Neo Capital will own 49% of the SPV, while the remaining 51% will belong to Harare. The joint venture period is 30 years. A total of US$400 million will be provided by Neo Capit
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.