Skip to main content

Autopistas de la Prosperidad, Colombia contracts out to tender

The first five sections of Colombia’s Autopistas de la Prosperidad have been put out to tender. The contracts, worth a combined US$3.52 billion (COP 6.4tn), will be awarded in November 2013. Overall, all nine sections of Autopistas de la Prosperidad are estimated to cost COP 13tn. The four remaining sections will go under the hammer in September 2013.
April 12, 2013 Read time: 1 min
The first five sections of Colombia’s Autopistas de la Prosperidad have been put out to tender. The contracts, worth a combined US$3.52 billion (COP 6.4tn), will be awarded in November 2013.

Overall, all nine sections of Autopistas de la Prosperidad are estimated to cost COP 13tn. The four remaining sections will go under the hammer in September 2013.

Related Content

  • Funding problems for major Polish highway project
    May 9, 2012
    The long tale of woe concerning Poland’s troubled A2 highway project looks set to continue with the latest developments in the case. The Chinese contractor China Overseas Engineering Group Co (Covec) is appealing against a decision made by the Polish national road authority GDDKiA. The Polish authorities cancelled the contract that COVEC had previously been awarded to build a section of the A2 highway between Warsaw and Lodz.
  • Contacts awarded for new UAE road links
    October 8, 2013
    Contracts for two major road projects in the United Arab Emirates (UAE) worth a combined US$2.01 billion (AED 7.40 billion) have been awarded. The contracts have been granted to Al Jaber Transport and General Contracting, Ghantoot Transport and General Contracting, Al Geemi & Partners Contracting Company, Bin Hafeez General Contracting Establishment, Delma Engineering, Larsen and Toubro, Abu Dhabi Salini Construction and Tristar for Engineering. One of the road projects will connect Dubai with Abu Dhabi,
  • Bolivia road project delay as tenders behind schedule
    January 15, 2018
    Bolivia’s US$554 million Occidente road project is running behind schedule and is now expected to be complete in 2020. Construction of one section, from Caracollo-Confital, is underway with close to 60% of the work having been complete. However two of the three sections of the route have not yet been put to tender. The work for the Caracollo-Confital stretch was to have been completed by January 2018 but will now be finished by September 2018. This stretch was delayed by poor weather as well as material
  • Sacyr enters Paraguay road sector
    October 25, 2016
    Sacyr subsidiary Sacyr Concesiones is leading a consortium to will build and operate the Road 2 and Road 7 routes in Paraguay. The Road 2 route will connect Asunción and Coronel Oviedo. Meanwhile the Road 7 route will run from Coronel Oviedo to Caaguazú. Construction is expected to cost US$520 million with the concession package being for a period of 30 years. The Route 2 and Route 7 combined deal is of note as this will be Paraguay’s first PPP for a highway project. The consortium is headed by Sacyr Conces