Skip to main content

ARTBA addresses wetlands permissions

The American Road & Transportation Builders Association (ARTBA) is offering the US Army Corps of Engineers (Corps) advice on reducing unnecessary regulatory red-tape on transportation projects through improving the wetlands permissions process. ARTBA has submitted comments to the Corps in response to a government-wide regulatory review initiated by President Obama in 2011. This advice from ARTBA details specific recommendations to make wetlands permitting more efficient. ARTBA is working on ways to reduce u
April 19, 2012 Read time: 2 mins
The American Road & Transportation Builders Association (ARTBA) is offering the US Army Corps of Engineers (Corps) advice on reducing unnecessary regulatory red-tape on transportation projects through improving the wetlands permissions process. ARTBA has submitted comments to the Corps in response to a government-wide regulatory review initiated by President Obama in 2011. This advice from ARTBA details specific recommendations to make wetlands permitting more efficient. ARTBA is working on ways to reduce unnecessary delays in the transportation review and approval process. Currently, it can take anywhere from nine to 19 years for a project to go from planning to completion. ARTBA stressed the need to make the wetlands permitting process less complicated, without sacrificing environmental protections. It has asked the Corps to place strict time limits on permitting decisions, allowing planners to know exactly when a decision would be reached on a project and plan accordingly. ARTBA has suggested that no permits should be required when projects do not have an ecological effect on wetlands, and regulations should not be mandated when there is no practical need. In addition ARTBA also suggests that the US 1293 Environmental Protection Agency (EPA) should be removed from permission decisions. Protection of sensitive areas is assured though through ARTBA’s plan as both US Congress and the courts have given the Corps the sole responsibility for wetlands permissions. This policy would reduce bureaucracy as there is no need for two agencies to carry out a job that can be handled by one. ARTBA’s recent comments represent the fourth agency-wide regulatory review the association has participated in since early 2011. The association also offered detailed comments to the 2364 US Department of Transportation, EPA, and Small Business Administration

For more information on companies in this article

Related Content

  • Advances in bitumen technology will boost surface wear life and quality
    September 19, 2012
    From chip fat to banana bags, the race is on to find new bitumen additives which will solve two problems with one solution: replace diminishing petrochemical-based products and make use from waste rather than landfilling it - Kristina Smith reports It is not just the desire to preserve our environment which is driving the industry’s search for products which don’t eat up raw materials. The hunger of emerging economies – particularly China – mean that resources can be hard to come by, so it makes sense for s
  • Tyne tunnel's water quality checks
    February 6, 2012
    Five buoy-mounted automatic water quality monitors (AWQMs) have been installed by YSI Hydrodata engineers at the new Tyne Tunnel project in north-east England. The equipment on the second vehicle tunnel under the River Tyne, currently one of the UK's largest construction projects, aims to ensure that construction operations do not significantly affect river water quality. Unusually, the contractors have not taken ownership of the instrumentation, preferring instead to simply purchase the data and alarms. Th
  • Kijlstra’s headwalls are coming up smelling of Roses
    January 3, 2013
    More than 100 of Kijlstra’s precast concrete headwalls are being used on a trunk road improvement in South West Wales. They were said to be chosen are being used on Welsh Government’s €69.72 million (£56.7mn) St Clears to Red Roses upgrade for their eco-friendly, health and safety and time/cost/waste saving benefits. The standard Type 1 headwalls are being installed by main contractor SRB Civil Engineering (a joint venture between Roadbridge and John Sisk & Son). They are being connected to both concrete an
  • Turning the construction industry green
    May 12, 2023
    Green is good for industry – delivering sustainability can also help reduce costs for construction firms, ensuring better financial performance