Skip to main content

ARTBA addresses wetlands permissions

The American Road & Transportation Builders Association (ARTBA) is offering the US Army Corps of Engineers (Corps) advice on reducing unnecessary regulatory red-tape on transportation projects through improving the wetlands permissions process. ARTBA has submitted comments to the Corps in response to a government-wide regulatory review initiated by President Obama in 2011. This advice from ARTBA details specific recommendations to make wetlands permitting more efficient. ARTBA is working on ways to reduce u
April 19, 2012 Read time: 2 mins
The American Road & Transportation Builders Association (ARTBA) is offering the US Army Corps of Engineers (Corps) advice on reducing unnecessary regulatory red-tape on transportation projects through improving the wetlands permissions process. ARTBA has submitted comments to the Corps in response to a government-wide regulatory review initiated by President Obama in 2011. This advice from ARTBA details specific recommendations to make wetlands permitting more efficient. ARTBA is working on ways to reduce unnecessary delays in the transportation review and approval process. Currently, it can take anywhere from nine to 19 years for a project to go from planning to completion. ARTBA stressed the need to make the wetlands permitting process less complicated, without sacrificing environmental protections. It has asked the Corps to place strict time limits on permitting decisions, allowing planners to know exactly when a decision would be reached on a project and plan accordingly. ARTBA has suggested that no permits should be required when projects do not have an ecological effect on wetlands, and regulations should not be mandated when there is no practical need. In addition ARTBA also suggests that the US 1293 Environmental Protection Agency (EPA) should be removed from permission decisions. Protection of sensitive areas is assured though through ARTBA’s plan as both US Congress and the courts have given the Corps the sole responsibility for wetlands permissions. This policy would reduce bureaucracy as there is no need for two agencies to carry out a job that can be handled by one. ARTBA’s recent comments represent the fourth agency-wide regulatory review the association has participated in since early 2011. The association also offered detailed comments to the 2364 US Department of Transportation, EPA, and Small Business Administration

For more information on companies in this article

Related Content

  • Challenges and investment opportunities in East Africa transport infrastructure Sector
    November 21, 2014
    East Africa offers considerable potential for transport infrastructure expansion and investment - Shem Oirere reports Infrastructure, infrastructure and more infrastructure is what is needed to make East Africa the favoured destination and Kenya, Tanzania, Uganda and Rwanda have unveiled grand plans to enhance the infrastructure both nationally and regionally.” This is how market analyst Deloitte introduced its 2014/15 budget analysis for the four countries in July.
  • The right equipment – a key in recycling
    April 1, 2021
    Globally, the amount of construction and demolition waste is growing. Recycling can effectively deal with it if the right equipment is chosen. Meet Metso Nordtrack™ – a combination of value-for-money made to make contracting more productive.
  • Market gains are expected for tyre pressure monitoring systems
    December 13, 2012
    A new report by research body Frost & Sullivan says that growing replacement volumes are boosting demand for tyre pressure monitoring technology in Europe and North America. Laws requiring the installation of tyre pressure monitoring systems (TPMS) in new vehicles are leading to an increase in the installed base of this technology in the European Union (EU) and the United States. With the proliferation of universal sensors and aggressive efforts to raise consumer awareness, the TPMS aftermarket is set for r
  • Road repairs take to the air
    November 29, 2018
    Automated road repairs using 3D printing could save money and reduce disruption, reports Kristina Smith It’s the middle of the night and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road-repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location to protect the repair drone and divert traffic around it.