Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Slovakian bridge defies high explosives demolition attempt
    November 15, 2012
    An incomplete bridge in Slovakia surprisingly defied an attempt to bring it down with high explosives, officially authorised after the death of four workers in an accident during its construction. The attempt to blast off the part of the under construction D1 highway bridge between the villages of Iliašovce and Kurimany (Prešov region) was made on Tuesday, November 13, 11 days after the tragic incident which also resulted in injuries to a number of other workers.
  • Improved access technology from Ruthmann
    January 6, 2017
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Improved access technology from Ruthmann
    January 31, 2013
    From German firm Ruthmann comes the new Steiger T 7XX unit, which broadens its height performance access equipment series. Featuring sturdy construction, the unit is said to be both robust and durable with fine-grained steel used to maximise the performance of its telescoping boom. The design is weight-optimised, due to high-strength steel being used during fabrication. Lateral reach and working height capacities have been increased and even under heavy loads, the platform is said to be sturdy and stable. T
  • Sharing Knowledge across Borders with the IRF Examiner
    June 8, 2015
    Now in its second year and sixth edition, the IRF’s flagship technical journal has become a valuable global knowledge resource for road practitioners on the state of the art across road disciplines. “The wealth of knowledge accumulated during the 17th IRF World Meeting & Exhibition in Riyadh was the driving force behind our decision to launch the IRF Examiner as a freely available resource for the industry,” recalls IRF chairman Eng Abdullah Al-Mogbel.