Skip to main content

Algeria gives go ahead for 63km Guelma-Annaba motorway

Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years. Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma. In the province of Annaba, Kadi said that work had started on another section of the mot
December 11, 2014 Read time: 2 mins
Work has started on Algeria’s 63km bypass motorway to connect Guelma with Annaba and the East-West motorway, which is set to be completed within two years.

Algeria’s Minister for Public Works Abdelkader Kadi made the announcement, has announced the launch of work on the 63km bypass connecting Guelma with Annaba. Nearly $346 million has been set aside for the 35km part of the project within the province of Guelma.

In the province of Annaba, Kadi said that work had started on another section of the motorway near the Rabah-Bitat airport. He also announced the opening of the 1.2km Annaba viaduct which cost $254 million.

3260 World Highways %$Linker: 2 Internal <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 19290 0 oLinkExternal reported in November Visit &quot;algerian highway deals being planned&quot; page false /categories/auctions-equipment-supply-servicing-finance/news/algerian-highway-deals-being-planned/ false false%> that the package for the 84km section connecting Annaba with the Tunisian border via the El-Tarf province was allocated to two national groupings. The work was previously being done by the Japanese firm Cojaal.

The Ministry for Public Works said in November that tolling on the East-West Highway will start before the end of 2015. A study is underway to determine how charges can be based on the maintenance and management costs of the link.

For more information on companies in this article

Related Content

  • Soilmec shows SC-70 and SC-90 hydraulic crawler cranes
    January 6, 2017
    Models brought to bauma by Soilmec included two new multipurpose hydraulic crawler cranes for heavy-duty applications. Among key features of the SC-70 and SC-90 is a design that enables easy transport and set-up on site. The cranes are modular for fast conversion between a range of applications, such as use with a hydraulic or mechanical grab, hydromill, chisel, vibratory driver or clamshell. New Tier 4 engines are available.
  • Soilmec shows SC-70 and SC-90 hydraulic crawler cranes
    April 19, 2013
    Models brought to bauma by Soilmec included two new multipurpose hydraulic crawler cranes for heavy-duty applications. Among key features of the SC-70 and SC-90 is a design that enables easy transport and set-up on site. The cranes are modular for fast conversion between a range of applications, such as use with a hydraulic or mechanical grab, hydromill, chisel, vibratory driver or clamshell. New Tier 4 engines are available.
  • Nylacast is offering long life crane sheaves
    January 6, 2017
    The novel cranes sheaves now being offered by component specialist Nylacast are said to extend rope wear life and reduce maintenance needs. The innovative polymer formulation shares technology with the proven Bigfoot outrigger pads, which help with load distribution in crane lift applications. The new polymer sheaves are said to offer key benefits over existing steel sheaves such as lower weight, which makes them easier to handle during installation or replacement.
  • Nylacast is offering long life crane sheaves
    March 27, 2013
    The novel cranes sheaves now being offered by component specialist Nylacast are said to extend rope wear life and reduce maintenance needs. The innovative polymer formulation shares technology with the proven Bigfoot outrigger pads, which help with load distribution in crane lift applications. The new polymer sheaves are said to offer key benefits over existing steel sheaves such as lower weight, which makes them easier to handle during installation or replacement.