Skip to main content

200 exhibitors get set for Interoute&Ville2012

Organisers of the Interoute&Ville 2012 being held in Lyon, France later this year say they are set to welcome 200 exhibitors, 7,000 professional visitors and 700 delegates. Held every two years and acclaimed internationally, the exhibition is dedicated to materials, equipment and technologies for streets, roads, highways and cities, bringing together professionals who work in the fields of infrastructures and land use planning. This year, organisers are creating a ‘smart infrastructure village’ to assist co
May 11, 2012 Read time: 2 mins
Organisers of the 243 Interoute&Ville 2012 being held in Lyon, France later this year say they are set to welcome 200 exhibitors, 7,000 professional visitors and 700 delegates.

Held every two years and acclaimed internationally, the exhibition is dedicated to materials, equipment and technologies for streets, roads, highways and cities, bringing together professionals who work in the fields of infrastructures and land use planning.

This year, organisers are creating a ‘smart infrastructure village’ to assist company delegate meetings with clients. It will be based on three main themes: energy, information and communication technologies; and interconnectable software.

Among companies set to exhibit at Interoute&Ville 2012 are 152 3M; 5511 BP; 3016 Cemex; 4017 Delta Bloc; 217 Fayat; 337 Swarco; 1279 Sovitec; and 1285 Zehntner.

Alongside what will be the 5th edition of the Interoute&Ville event, being held October 2-4, 2012, in Lyon’s Eurexpo centre, will be the IDRRIM (French Institute of Roads, Streets and Infrastructure for Mobility) Conference for the French road community. This conference is described as having a high value of technology and prospecting, making it a benchmark event for the road technical community. Organisers say speeches during the conference will be in French only.

For more information about Interoute&Ville 2012 visit %$Linker: External 0 0 0 oLinkExternal www.interoute-ville.com Interoute&Ville false http://www.interoute-ville.com/ false false%>

For more information on companies in this article

Related Content

  • Putzmeister adds five-section pump
    January 6, 2017
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • Putzmeister adds five-section pump
    April 19, 2013
    Putzmeister has added a five-section 38m, 160m3/hr concrete pump, which can be used to place loads inside buildings some 3m higher than the four-section option. Built on a 26tonne chassis, the new 38.5 can reach heights of 31m while leaving the final boom section to pass inside the building. In common with the company’s other machines, the 38.5 now has outrigger sensing, which feeds into the control system and prevents the boom from extending/slewing if the outriggers are not fully deployed. The machine als
  • IRF Supports Capacity Building for Performance-Based Road Contracts
    December 23, 2014
    For 10 days in October, more than 40 highway engineering professionals from 14 different countries congregated in Orlando, Florida, USA. With lecturers from The Netherlands, Finland, New Zealand, Canada and the US the group discussed the specifics about how to effectively write, implement and enforce performance-based contracts.
  • Five things road construction crews should not do
    June 19, 2015
    Sometimes you need a sense of humour to complete a task. Sometimes that sense of humour can overstep the mark and not everyone will see the joke, as these five road construction site pictures show. Here are five things that construction crews should not do.