The transport secretary also unveiled funding for 2025-26 for National Highways, the English road agency, to deliver critical road schemes and maintain motorways and critical major A-roads.
For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.
The nearly US$500,000 project involves the replacement of corroded bolts and steel members and steel plates to the bridge that connects the islands of Biliran and Leyte.