Skip to main content

GRAA Winner Profile: Samuel De Champlain Bridge Corridor project

The Samuel De Champlain Bridge Corridor in Montreal, Canada is a complex project which includes one of the largest bridge projects in North America, the $4.2 billion signature cable-stayed Samuel De Champlain Bridge, as well as a new Île-des-Soeurs Bridge, reconstruction and widening of the federal portion of Autoroute 15, a 2,044m west approach, and a 762m east approach.
June 7, 2023 Read time: 3 mins

Opened to traffic on July 1, 2019, this Public-Private-Partnership project was delivered in only 48 months (from design to substantial completion) and met all quality objectives through the implementation of a comprehensive design quality management plan (DQMP).

The quality system set the framework for all major processes, including multiple layers of design reviews and checks, change management, design surveillance in fabrication and construction, and quality audits. This complex project required close collaboration amongst all stakeholders including designers, specialty experts, fabricators, constructors, reviewers/ checkers, and owners. The quality team’s efforts went beyond what was required by the project agreements to overcome challenges associated with managing a large global team.

The Samuel De Champlain Bridge came with stringent design requirements and performance criteria. The bridge had to be designed to withstand a long list of site-specific challenges such as ice loading and abrasion, wind and seismic hazards, vessel collision and scour potentials. Adding to these challenges was Montreal’s severe winters which mandated the shutdown of the seaway operations for four months of the year; this necessitated utilising precasting and prefabrication offsite to minimise onsite erection time. TYLI, as the joint venture managing partner, managed over 15 subconsultants, whose interactions required overlap and extensive coordination. The technical demands of the project drove the team to be creative in its organisation, and in turn, its quality management program.

IRF WashingtonThe private partner developed, implemented, and maintained an ISO 9001-compliant Design Quality Management Plan, which TYLI tailored to contain project-specific missions, visions, and goals; defined roles and responsibilities of the team members.

The DQMP instituted multiple quality measures that exceeded the project requirements including an independent check of the design by a separate team, still internal to the design joint venture. In this check, the team used different analysis software to validate the design, providing added assurance to the products. Changes in the design during fabrication and construction were also subject to the same quality control process as the original design - resulting in a successful project completed within a tight timeframe in this challenging location.

Receiving the IRF Award in the Quality Category category, Carol Choi, PE, CMQ/OE, TYLin design quality manager for the Samuel De Champlain Bridge Corridor Project noted, “TYLin ensured that this design-build project was guided to completion through a comprehensive quality management plan. Our entire team is very honoured to be recognised for our excellence in Quality Management.”


Showcasing industry excellence

The International Road Federation’s Global Road Achievement Awards (GRAA) is a one-of-a kind competition to recognise innovative road projects and exemplary people that place the road industry at the forefront of worldwide social and economic development.

Instituted in 2000, the Awards have distinguished more than 200 programmes, projects and products from around the world. Today, the Awards are recognised as a prestigious industry accolade in their own right, but they also serve to remind a much wider audience that the mobility everyone takes for granted would not be possible without the talent and commitment of our industry.

2023 applications are currently being accepted across the 12 award categories until May 8, 2023 at www.irf.global/graa

For more information on companies in this article

Related Content

  • IRF’s GRAA awards applications deadline
    June 23, 2014
    Applications for this year’s International Road Federation (IRF) Global Road Achievement Awards (GRAA) had to be in by Monday 30 June 2014. GRAA is a one-of-a-kind competition to recognise innovative road projects and exemplary people that place the road industry at the forefront of worldwide social and economic development. The IRF views the awards as an important way to promote road innovation around the world and will make substantial efforts to see that the awarded achievements receive maximum wor
  • GRAA focuses on winning project profile: Brisbane Airport Link, Northern Busway & Airport
    May 19, 2014
    The revolutionary AUD$4.8 billion Airport Link has delivered a landmark infrastructure project for Australia, tackling traffic congestion, enhancing the busway network and removing an infamous traffic bottleneck through an innovative and inspired design. The Airport Link in Brisbane, Australia included three separate projects – the Northern Busway (a 3km two-way dedicated busway), the Airport Roundabout Upgrade and the AirportlinkM7 (a 6.7km toll road including 5.2km of tunnel). Together, they represent the
  • IRF GRAA Winners Unveiled at 17th IRF World Meeting 2013
    December 11, 2013
    The winners of the 2013 Global Road Achievement Awards were announced during the 17th IRF World Meeting & Exhibition gala dinner at the Ritz Carlton in Riyadh, Saudi Arabia. More than 800 delegates from around the world attended the ceremony, held on November 13, 2013, which celebrated the most comprehensive and well-attended IRF World Meeting in several decades.
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow