Skip to main content

Ruthmann's Greek motorway order

Olympia Odos and Aegean Motorway of Greece have received four STEIGER T 180 aerial platforms from German manufacturer Ruthmann. Both companies had previously rented STEIGER products, but decided to purchase the models to enhance their fleet of maintenance vehicles.
February 28, 2012 Read time: 2 mins
The four STEIGER T 180 aerial platforms will be used on Greek highways
3286 Olympia Odos and 3289 Aegean Motorway of Greece have received four STEIGER T 180 aerial platforms from German manufacturer 3285 Ruthmann.

Both companies had previously rented STEIGER products, but decided to purchase the models to enhance their fleet of maintenance vehicles.

The T 180s will be used to service street lighting, CCTV (closed-circuit television) cameras and traffic signs.

Two of the aerial platforms will be used by Aegean Motorway on a major highway expansion project in Greece, which involves the improvement, construction and development of a 230km stretch of highway between Athens and Thessaloniki. The other two STEIGER T 180 models will assist Olympia Odos on the Elefsina-Patras-Tsakona highway expansion project, a major project that involves the improvement, construction and establishment of a 360km stretch of highway between Athens, Patras and Pyrgos.

Work on both projects began in 2008 and will take 30 years to complete.
German, French and Greek construction companies are working in unison on the two highway expansion projects which, when finished, will greatly reduce travel times in Greece, while regional and economic development along the new highways will be enhanced significantly.

Improvement and construction of the toll highways will also increase the level of safety, reducing accident rates and road fatalities.

"The T 180 provides versatility, mobility and safety which are simply a must on the jobsite," says Andreas Hoppe of Aegean Motorway.

For more information on companies in this article

Related Content

  • Special formwork solution for tricky Orinoco project
    April 24, 2013
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood plain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shape with the Venezuelan government investing in the showcase project at Caicara del Orinoco. The bridge will have an overall length of 11.125km on completion, which is scheduled for 2015. The main bridge is 2.28km long, and the roadway is 55m above
  • Developing Brazil's transport infrastructure
    February 16, 2012
    The IRF and ABCR spoke with World Highways about the upcoming 7th Brazilian Congress on Highways and Concessions event
  • Special purpose add-ons for demolition excavators
    February 16, 2012
    Long reach demolition excavators are now special purpose machines, Dan Gilkes reports. The majority of construction equipment manufacturers offer a range of demolition specific machines, built to meet the needs of a sector of the industry that works its plant harder than most.
  • Special purpose add-ons for demolition excavators
    April 13, 2012
    Long reach demolition excavators are now special purpose machines, Dan Gilkes reports The majority of construction equipment manufacturers offer a range of demolition specific machines, built to meet the needs of a sector of the industry that works its plant harder than most. Reinforced structures, additional hydraulic services, cab and body protection, dust suppression and additional engine air cleaners are just some of the standard alterations required by the demolition contractor. For many years exca