Skip to main content

Ruthmann's Greek motorway order

Olympia Odos and Aegean Motorway of Greece have received four STEIGER T 180 aerial platforms from German manufacturer Ruthmann. Both companies had previously rented STEIGER products, but decided to purchase the models to enhance their fleet of maintenance vehicles.
February 28, 2012 Read time: 2 mins
The four STEIGER T 180 aerial platforms will be used on Greek highways
3286 Olympia Odos and 3289 Aegean Motorway of Greece have received four STEIGER T 180 aerial platforms from German manufacturer 3285 Ruthmann.

Both companies had previously rented STEIGER products, but decided to purchase the models to enhance their fleet of maintenance vehicles.

The T 180s will be used to service street lighting, CCTV (closed-circuit television) cameras and traffic signs.

Two of the aerial platforms will be used by Aegean Motorway on a major highway expansion project in Greece, which involves the improvement, construction and development of a 230km stretch of highway between Athens and Thessaloniki. The other two STEIGER T 180 models will assist Olympia Odos on the Elefsina-Patras-Tsakona highway expansion project, a major project that involves the improvement, construction and establishment of a 360km stretch of highway between Athens, Patras and Pyrgos.

Work on both projects began in 2008 and will take 30 years to complete.
German, French and Greek construction companies are working in unison on the two highway expansion projects which, when finished, will greatly reduce travel times in Greece, while regional and economic development along the new highways will be enhanced significantly.

Improvement and construction of the toll highways will also increase the level of safety, reducing accident rates and road fatalities.

"The T 180 provides versatility, mobility and safety which are simply a must on the jobsite," says Andreas Hoppe of Aegean Motorway.

For more information on companies in this article

Related Content

  • M27 contract for McCann
    July 29, 2020
    Highways England has awarded an M27 contract to McCann.
  • Germany builds its first major PPI autobahn project
    July 7, 2015
    Rebuilding of one of the oldest motorways in Germany is testing out the possibilities for public-private project road construction reports Adrian Greeman A freshly renovated section of the A8 Autobahn in southern Germany will be watched with some interest this summer as traffic begins driving along its rebuilt carriageway and additional third lanes. That is not because of any special road features, other than a distinctive reddish colour to its concrete surface, but because it is a first fullscale public
  • World debut for Ruthmann’s T 720 truck-mounted platform
    January 6, 2017
    The newest addition to Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib. Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m. Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load.
  • World debut for Ruthmann’s T 720 truck-mounted platform
    April 17, 2013
    The newest addition to Ruthmann’s Height series offers flexible access in awkward situations thanks to its extended telescoping upper boom with moveable jib. Ruthmann’s Steiger T 720 truck-mounted access platform made its world debut at bauma. The model has a working height of up to 72m and maximum lateral reach of 38m. Its design means that operators still have 21.4m reach at their disposal at a working height of 68m and with a 100kg cage load.