Skip to main content

Ruthmann's Greek motorway order

Olympia Odos and Aegean Motorway of Greece have received four STEIGER T 180 aerial platforms from German manufacturer Ruthmann. Both companies had previously rented STEIGER products, but decided to purchase the models to enhance their fleet of maintenance vehicles.
February 28, 2012 Read time: 2 mins
The four STEIGER T 180 aerial platforms will be used on Greek highways
3286 Olympia Odos and 3289 Aegean Motorway of Greece have received four STEIGER T 180 aerial platforms from German manufacturer 3285 Ruthmann.

Both companies had previously rented STEIGER products, but decided to purchase the models to enhance their fleet of maintenance vehicles.

The T 180s will be used to service street lighting, CCTV (closed-circuit television) cameras and traffic signs.

Two of the aerial platforms will be used by Aegean Motorway on a major highway expansion project in Greece, which involves the improvement, construction and development of a 230km stretch of highway between Athens and Thessaloniki. The other two STEIGER T 180 models will assist Olympia Odos on the Elefsina-Patras-Tsakona highway expansion project, a major project that involves the improvement, construction and establishment of a 360km stretch of highway between Athens, Patras and Pyrgos.

Work on both projects began in 2008 and will take 30 years to complete.
German, French and Greek construction companies are working in unison on the two highway expansion projects which, when finished, will greatly reduce travel times in Greece, while regional and economic development along the new highways will be enhanced significantly.

Improvement and construction of the toll highways will also increase the level of safety, reducing accident rates and road fatalities.

"The T 180 provides versatility, mobility and safety which are simply a must on the jobsite," says Andreas Hoppe of Aegean Motorway.

For more information on companies in this article

Related Content

  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • Amey: “First” UK carbon-neutral resurfacing
    February 15, 2021
    Amey Consulting said the recycled road surface has greater porosity than hot-rolled asphalt.
  • Competitive asphalt compaction market
    February 13, 2012
    Existing tough competition will step up another gear with the launch of further new machines in the asphalt roller market, Mike Woof reports. The asphalt compaction equipment market is intensely competitive, with a number of major firms all fighting to boost market share. And with many major manufacturers having revamped ranges during 2010 and further new models now due, this rivalry is set to become tougher still.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.