Skip to main content

UK motorway upgrade underway

A fleet of Hitachi short-tailswing excavators have been working on the M3 smart motorway project in the counties of Hampshire and Surrey in England. Eight ZX135US-5 and ZX225USLC-5 excavators owned by Skyland Drainage Contractors, and a further two ZX225USLC-5s owned by Davey Civils, have been employed on the subcontractors’ drainage works. Having previously hired Zaxis excavators, Kent-based Davey Civils has been a Hitachi customer for one year. Both models were supplied with service contracts from Hita
December 14, 2015 Read time: 2 mins
Compact equipment from Hitachi is playing a key role in an important motorway upgrade in the UK to boost traffic capacity
A fleet of 233 Hitachi short-tailswing excavators have been working on the M3 smart motorway project in the counties of Hampshire and Surrey in England. Eight ZX135US-5 and ZX225USLC-5 excavators owned by Skyland Drainage Contractors, and a further two ZX225USLC-5s owned by Davey Civils, have been employed on the subcontractors’ drainage works.

Having previously hired Zaxis excavators, Kent-based Davey Civils has been a Hitachi customer for one year. Both models were supplied with service contracts from Hitachi Construction Machinery (UK) (HCMUK) when they were delivered in January 2015.

The machines have been working alongside live traffic on the project, with barriers to protect the working area from passing vehicles. Average speed camera technology has also been employed to ensure that drivers maintain a safe speed through the workzone.

An estimated 130,000 journeys are made on the M3 daily, which links south-west London to Southampton. The figure is set to increase by 30% over the coming years. The €180 million (£129 million) smart motorway scheme – awarded to international infrastructure group 1146 Balfour Beatty in July 2014 – will increase capacity, reduce congestion and shorten journey times by up to 15% between junctions 2 and 4a. Further benefits include smoother traffic flows, fewer road traffic collisions, and reduced noise and vehicle emissions.

For more information on companies in this article

Related Content

  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio
  • Connect Plus joins Highways Agency’s plea to drivers to take care through road works
    October 30, 2013
    Connect Plus, the design, build, finance and operating company for southern England’s M25 and its adjoining trunk routes, last week joined with the Highways Agency to convey vital messages to drivers passing through road works. The company, a joint venture consisting of Balfour Beatty, Skanska, Atkins and Egis Projects SA, was participating in the Highways Agency Road Worker Safety Week (21-28 October), which aimed to get across to the public some of the dangers road workers face in their work close to fas
  • Skanska Balfour Beatty install first M25 superspan gantry during motorway upgrade
    August 22, 2013
    The first superspan gantry has been installed over the M25 motorway near London, England. The structure near Junction 24 (Potters Bar, Hertfordshire) is part of the €219.92 million (£188 million) Managed Motorway scheme to upgrade the motorway between junctions 23 and 27. Weighing 36 tonnes and measuring 40m across, it is the first of five superspan gantries which will be installed during the project being carried out by Skanska Balfour Beatty, on behalf of the Highways Agency. The gantries will