Skip to main content

TSL Contractors in the UK adds more Volvos to its fleet

In the Scottish highland Isle of Mull, TSL Contractors has made a significant purchase of Volvo Construction Equipment products only a year after buying its first Volvo excavator. The company, based in the town of Craignure, will use the machines for building roads as part of the business’s many hydroelectric contracts. New machinery includes 14tonne EC140D excavators, three 22tonne EC220E and one EC300 30tonne excavators, as well as two A25G articulated haulers. TSL managing director Andrew Knight sa
October 16, 2015 Read time: 2 mins
In the Scottish highland Isle of Mull, TSL Contractors has made a significant purchase of 7659 Volvo Construction Equipment products only a year after buying its first Volvo excavator.

The company, based in the town of Craignure, will use the machines for building roads as part of the business’s many hydroelectric contracts.

New machinery includes 14tonne EC140D excavators, three 22tonne EC220E and one EC300 30tonne excavators, as well as two A25G articulated haulers. TSL managing director Andrew Knight said the new machines are building access roads to remote job sites and preparing trenches for laying large-bore water pipes. “We’ve been very impressed with the machine’s performance and reliability especially on heavy duty rock-breaking applications,” he said.

Typically this involves a good deal of rock breaking on site and consequently, the EC300E and EC220E’s have been supplied complete with hydraulic hammers. The 22tonne capacity A25G articulated haulers are deployed on hauling crushed stone to construct the access roads and move overburden on site. One of the trucks has been supplied with optional 750/65R25 floatation tyres giving the benefit of reduced ground pressure which is ideal for coping with more boggy conditions and minimising the impact on fragile ground.

The EC140D machines have been supplied with Steelwrist Tilt Rotators and are used primarily on reinstating the ground around the pipelines once the water pipes have been laid and covered.

Knight said the machines can reduce the impact on the environment because they both have tilt rotators. This means they can reinstate the surrounding area, including profiling and finishing simultaneously instead of using a variety of equipment. This also makes more economic sense, he said. Apart from hydroelectric contracts, TSL also specialises in affordable housing contracts for the Scottish government and contracts for Scottish Water and other national contractors. It also continues to maintain a presence in the extractive, aggregates and ready-mix concrete industries.

Related Content

  • Hitachi launches the first Zaxis-6 excavator in Europe
    April 23, 2015
    Hitachi Construction Machinery (Europe) has presented the first model of its Zaxis-6 medium excavator range, the X300LC-6, which is said to benefit from several enhancements made to the Zaxis-5 range. Hitachi design engineers have incorporated new TRIAS II technology into the Zaxis-6 range of excavators to meet EU Stage IV emission regulations. Hydraulic loss is decreased by reducing the amount of hydraulic oil returned to the tank due to cooperative control of the pump and valve.
  • Turkey’s new Marmara Highway project
    June 8, 2017
    By the end of 2018, a shiny new strip of asphalt will skirt around Turkey’s largest city, Istanbul, providing a new transport connection.
  • Asphalt paving is seeing innovative new technology
    April 4, 2013
    With new machines coming to market, the asphalt paving sector is seeing an array of sophisticated technology now available
  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra