Skip to main content

Summer duties for T&M Bowser Solutions

T&M’s fleet consists of 4x4 bowsers that can be filled from holding ponds and 4x2 bowsers that can be filled at hydrants or static tanks on a construction site.
By David Arminas May 13, 2021 Read time: 2 mins
Spread the word: T&M has 78 bowsers ranging in capacity 3,000 to 10,000 litres (image courtesy T&M Bower Solutions)

All 78 custom-built bowsers from UK-based T&M Bowser Solutions are reported to be already on road sites in anticipation of extremely dry weather this summer.

The manufacturer of tankers said it has 32 4x4 10,000-litre capacity vacuum tankers and 46 4x2 tankers, ranging in capacity from 3,000 to 10,000 litres.

Now all 78 vehicles are now on various construction, highways and infrastructure projects, said Terry Beasley, managing director at T&M. “Dust particles can be very small—not always visible—and as tools are used, vehicles travel or as the wind picks up, this dust can circulate in the air that workers are breathing.”

T&M’s fleet of 4x4s can be used to supply water to machinery and tanks. Many have spent the winter months sucking up rainfall from sites to prevent them from flooding. However, the priority is now very much on dust suppression.

The vehicles suck water from holding ponds through a pipe with a heavy-duty strainer on the end to prevent stones being drawn upward. These versatile vehicles can also remove summer rainfall and deposit it back into holding pools.

The 4x2s, meanwhile, are filled from a hydrant or static tanks on site. They are especially useful on motorway or urban projects where tractors or heavier duty vehicles can’t be used. T&M can combine various capacities in the smaller range to suit the particular requirements of the site. The entire fleet is cab-operated while in motion, further enhancing safety and efficiency.

“Both our 4x4 and 4x2 fleets can be used full-time on larger projects, as the risk of a site being shut down due to a lack of dust control is too high given the costs incurred,” explained Beasley. “We work with our partners to ensure that they can carry on working safely even in the driest of weather.”

Related Content

  • Rain storms destroy Beijing’s road surfaces
    August 17, 2012
    As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority. Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Essential tunnel maintenance
    March 2, 2012
    Highway road tunnels and inter-city vehicle underpasses are vital components of an essential busy highways network. Keeping them clean is essential. Road tunnels and vehicle underpasses require a specific strength of light. Too bright, and the lamps or lights may dazzle or distract drivers, and too dim the tunnel can seem claustrophobic and daunting, as well as increasing dangers from obstructions and other hazards.
  • Huesker: the case for geosynthetics
    April 19, 2022
    Huesker, a global manufacturer of geosynthetics and technical textiles, explains how incorporating geosynthetic material can boost a project’s environmental credentials*.