Skip to main content

Solar lighting trial for road construction

Successful trials have been carried out of mobile solar lighting for road construction activities. The mobile solar-powered lighting is said to offer cost savings for highways contractors and trials of the Prolectric ProLight have demonstrated its carbon and air quality benefits as an alternative to temporary diesel lighting towers. The technology has been pioneered by Prolectric to deliver year-round solar lighting and optimise winter performance. Temporary lighting frequently has to be deployed in heavi
June 28, 2018 Read time: 2 mins
Successful trials have been carried out of mobile solar lighting for road construction activities.


The mobile solar-powered lighting is said to offer cost savings for highways contractors and trials of the Prolectric ProLight have demonstrated its carbon and air quality benefits as an alternative to temporary diesel lighting towers. The technology has been pioneered by Prolectric to deliver year-round solar lighting and optimise winter performance. Temporary lighting frequently has to be deployed in heavily-populated urban areas and worker compounds for motorway and transport projects.

According to the firm, its solar lighting systems offer major cost benefits in comparison to diesel-powered units, by eliminating the need for refuelling and engine servicing. The company says that its solar array offers three times the power of any other solar light previously available. The firm says that it  also built in smart technology so that the unit’s on and off times could be controlled automatically while data on power usage and carbon savings could be monitored remotely.

Every ProLight is fitted with a micro-controller and GPS tracking, so it can monitored to ensure continued operation, enable on/off times to be adjusted remotely, as well as to record key data such as power generated and consumed.

Related Content

  • Asphalt plant innovations coming to market
    April 27, 2015
    A series of new advances in asphalt plant design are now coming to market - Mike Woof writes Key innovations in asphalt plant designs from major manufacturers will offer clients reductions in running costs along with gains in quality control and output. Several of the leading manufacturers are introducing new models that will deliver efficiency gains, as well as options for greater mobility and/or versatility. Swiss-based Ammann is introducing two new mobile plants, the EcoBatch and QuickBatch models,
  • New excavators and wheeled loaders for earthmoving market
    October 28, 2016
    Manufacturers are continuing to develop new excavators and wheeled loaders offering increased performance - Mike Woof writes. New developments are being seen in both the wheeled loader and excavator markets. Caterpillar, Daewoo, Hitachi, Hyundai, Komatsu, Kobelco and Volvo CE all have new wheeled loader or excavator models now available. The segment for wheeled loaders has seen particular innovation from Caterpillar, with different machines being introduced for tightly regulated and lesser regulated mark
  • High performance, high mobility of wheeled pavers
    February 14, 2012
    New generation wheeled pavers aimed at use in territories such as the UK, Italy, South Africa and Southern Germany are now coming to market. Pavers in these countries are often expected to be driven from one part of a site to another or for short distances, which is why the additional mobility of the wheeled machine is preferred in many instances over similarly-sized tracked models. This preference for wheeled units comes in spite of the greater stability offered by tracked machines. BOMAG, Caterpillar and
  • Wirtgen Group machines delivering new runway for German airbase
    October 26, 2016
    Machines from the Wirtgen Group are carrying out an important reconstruction job for the surface course at Büchel Air Base. Road machinery from Hamm, Vögele and Wirtgen as well as asphalt plants from Benninghoven have been carrying out the work, delivering a new runway within a tight timeframe. To achieve this, the work had to be planned well in advance, with the contractors organising the logistics and their personnel accordingly.