Skip to main content

Safer traversing of utility works

Oxford Plastics says that its SafeKerb ramp units exceed the requirements of wheelchair guidelines and disability legislation. The Safekerb SupaGrip products provide a safe means for wheelchair and pushchair users to go up or down a kerb or step. These units can be used when a footpath is closed for utility works. This innovative product has been designed by market-leading UK manufacturer Oxford Plastics to comply with and exceed the requirements of the Wheel Chair Boarding Ramp Specification, the Safet
March 9, 2016 Read time: 2 mins
The Safekerb product allows those with a disability to cross areas with street repairs more easily and safely
8292 Oxford Plastic Systems says that its SafeKerb ramp units exceed the requirements of wheelchair guidelines and disability legislation. The Safekerb SupaGrip products provide a safe means for wheelchair and pushchair users to go up or down a kerb or step. These units can be used when a footpath is closed for utility works.

This innovative product has been designed by market-leading UK manufacturer Oxford Plastics to comply with and exceed the requirements of the Wheel Chair Boarding Ramp Specification, the Safety at Streetworks Code of Practice and the Disability Discrimination Act.

The new kerb ramp weighs just 8.75kg, making it easy to lift into place, and is now able to support an increased weight of up to 350kg. It can be adapted to varying kerb or step heights, from 60-160mm.

The main body of the improved kerb ramp is made from high-density polyethylene (HDPE) and includes a heavy leading edge made from PVC on both the pavement and road side.

The SafeKerb SupaGrip also has an effective anti-slip surface and raised sides for additional safety, and does not need pinning, although it can be bolted down if required. Its improved ground adhesion makes it even safer than the original version. The product also stacks neatly for easy transport and storage.

For more information on companies in this article

Related Content

  • A novel compact grading solution
    October 16, 2012
    One of the interesting developments at the recent Hillhead quarry show in the UK, was of a rather more compact machine than usually seen at the exhibition. A UK equipment rental firm, CLS Selfdrive, revealed a US-manufactured compact grader equipped with machine control equipment. This is of note seeing that such machine control technologies are usually fitted to much larger machines. The increasing proliferation of the systems and the reduction in costs in real terms however means that this technology is n
  • Atlanta airport’s new apron
    October 12, 2012
    The new Maynard H Jackson Jr International Terminal at Hartsfield- Jackson Atlanta International Airport is now open for business. The 111,484m2 terminal features 12 gates, eight security checkpoints, separate levels for arrivals and departures, as well as a 148,831m2 concrete apron for aircraft to park on arrival. Archer Western won the contract to slipform the concrete apron, replace the existing Taxiway D, as well as other utilities and embankment work. The firm brought in one of its GOMACO paving trains
  • Novel drilling system from Minnich
    March 17, 2016
    Minnich Manufacturing has expanded its product range with a series of new models that offer additional capabilities. One of these is a special application drill designed for pinning temporary concrete barriers that separate traffic from work zones. The drill is said to save time and cost by eliminating the need for multiple workers to drill holes by hand. The barrier-mounted drill is designed to ride along the top of the wall and can drill three holes simultaneously. The self-propelled machine runs off a
  • Recycling used for German road expansion project
    April 20, 2018
    A milling machine from Bomag has been carrying out an important portion of the work needed for a four-lane expansion of a busy route in Southern Germany Widening work has been carried out on the B85 route from Amberg to Pittersberg in Bavaria to boost its capacity. The 2.6km section was prioritised as being in urgent need of improvement by the Federal transport Ministry. Construction work commenced in mid-2017, starting with preparation works and the project includes a cloverleaf interchange to connect t