Skip to main content

Safe pipe lifting from CPSA

The new award-winning Pipe Lifter is designed for fitting on a standard excavator with a simple quick-hitch coupling, while requiring no hydraulic links or additional energy requirements onsite. The innovative tool from the UK-based Concrete Pipeline Systems Association (CPSA) is said to ensure the safe lifting and swift installing of large diameter concrete pipe products.
August 21, 2012 Read time: 2 mins

The new award-winning Pipe Lifter is designed for fitting on a standard excavator with a simple quick-hitch coupling, while requiring no hydraulic links or additional energy requirements onsite.

The innovative tool from the UK-based 6416 Concrete Pipeline Systems Association (CPSA) is said to ensure the safe lifting and swift installing of large diameter concrete pipe products.

Having already won the Best Health and Safety Initiative category in the Water Industry Awards 2012, the Pipe Lifter (PL) is being made fully available for hire or purchase through CPSA supply partner 6417 MGF.

Using the PL means there is no need for anyone to stand on the bed of the vehicle when offloading - the biggest cause of accidents on site. The CPSA claim it also eliminates the need for anyone to stand in a trench during jointing.

Requiring no slings or chains, the whole pipe laying operation is said to be around 50% faster than using traditional lifting methods. The PL is designed to handle UK specification BS EN1916 concrete pipes from DN 300 to DN1200.

The Manhole Lifter is a companion device said to make lifting manhole rings a safe and easy one-man operation for precast concrete manhole rings.

For more information on companies in this article

Related Content

  • Herrenkencht has developed a novel pipeline installation package
    February 6, 2013
    Herrenknecht’s innovative Pipe Express system offers a novel semi-trenchless method of installing pipelines effectively and efficiently. The system can cope with pipe diameters from 800mm-1.5m and is a combination of tunnel boring machine (TBM) technology with a chain trencher. The TBM unit, trencher and buggy run on the surface, along with an operating vehicle and the equipment is modular and said to be easy to transport and set-up on site. Silke Rockenstein is in charge of corporate communications at the
  • New barriers are helping improve road safety
    June 30, 2014
    A series of new guardrail technologies and barrier developments are now coming to market - Mike Woof writes. An array of technical developments is helping improve highway safety for road users. New barrier and guardrail technologies can offer greater conspicuity so as to alert drivers, along with better restraint capabilities. Gregory Industries offers a wide range of steel and cable barrier types and has now developed an attachment system for international use. This fixes the guardrail to the post and in t
  • New equipment for materials testing
    January 13, 2014
    Leading formwork manufacturers have secured some impressive contracts in Africa, as the continent’s transport infrastructure continues to improve at a rapid pace. Meanwhile, other bridgework equipment companies are also seeing their products in demand in Africa, as well as North America and Australia. Guy Woodford reports
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w