Skip to main content

Safe pipe lifting from CPSA

The new award-winning Pipe Lifter is designed for fitting on a standard excavator with a simple quick-hitch coupling, while requiring no hydraulic links or additional energy requirements onsite. The innovative tool from the UK-based Concrete Pipeline Systems Association (CPSA) is said to ensure the safe lifting and swift installing of large diameter concrete pipe products.
August 21, 2012 Read time: 2 mins

The new award-winning Pipe Lifter is designed for fitting on a standard excavator with a simple quick-hitch coupling, while requiring no hydraulic links or additional energy requirements onsite.

The innovative tool from the UK-based 6416 Concrete Pipeline Systems Association (CPSA) is said to ensure the safe lifting and swift installing of large diameter concrete pipe products.

Having already won the Best Health and Safety Initiative category in the Water Industry Awards 2012, the Pipe Lifter (PL) is being made fully available for hire or purchase through CPSA supply partner 6417 MGF.

Using the PL means there is no need for anyone to stand on the bed of the vehicle when offloading - the biggest cause of accidents on site. The CPSA claim it also eliminates the need for anyone to stand in a trench during jointing.

Requiring no slings or chains, the whole pipe laying operation is said to be around 50% faster than using traditional lifting methods. The PL is designed to handle UK specification BS EN1916 concrete pipes from DN 300 to DN1200.

The Manhole Lifter is a companion device said to make lifting manhole rings a safe and easy one-man operation for precast concrete manhole rings.

For more information on companies in this article

Related Content

  • Data sharing boosts workzone safety
    March 2, 2012
    Faster and safer utilities works are the benefit of innovative data sharing moves – Mike Woof writes
  • Compact demolition tool from Brokk
    December 2, 2014
    The upgraded electric Brokk 400 demolition tool now benefits from a larger undercarriage for heavy-tracking applications. This remote-controlled demolition machine also has a new hydraulic system, with more efficient fluid flow when the machine is operating a drill attachment. The new 400 model machine features a bigger drive axis, rollers and sidetracks. The new tracks are 10% longer than before, improving wear life for machines used in applications that require a lot of tracking and provides up to 60% gre
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • Demand for asphalt testing solutions
    February 14, 2012
    Asphalt testing is performed for a variety of reasons by a variety of companies. Patrick Smith reports Road safety is in the interest of everyone and today it is also an important target shared by the majority of the companies involved in road design and construction. The growing attention paid to this value has had a remarkable effect on the material testing field, encouraged by an increasing market demand for testing solutions as well as by the new technical requirements established by international st