Skip to main content

Safe pipe lifting from CPSA

The new award-winning Pipe Lifter is designed for fitting on a standard excavator with a simple quick-hitch coupling, while requiring no hydraulic links or additional energy requirements onsite. The innovative tool from the UK-based Concrete Pipeline Systems Association (CPSA) is said to ensure the safe lifting and swift installing of large diameter concrete pipe products.
August 21, 2012 Read time: 2 mins

The new award-winning Pipe Lifter is designed for fitting on a standard excavator with a simple quick-hitch coupling, while requiring no hydraulic links or additional energy requirements onsite.

The innovative tool from the UK-based 6416 Concrete Pipeline Systems Association (CPSA) is said to ensure the safe lifting and swift installing of large diameter concrete pipe products.

Having already won the Best Health and Safety Initiative category in the Water Industry Awards 2012, the Pipe Lifter (PL) is being made fully available for hire or purchase through CPSA supply partner 6417 MGF.

Using the PL means there is no need for anyone to stand on the bed of the vehicle when offloading - the biggest cause of accidents on site. The CPSA claim it also eliminates the need for anyone to stand in a trench during jointing.

Requiring no slings or chains, the whole pipe laying operation is said to be around 50% faster than using traditional lifting methods. The PL is designed to handle UK specification BS EN1916 concrete pipes from DN 300 to DN1200.

The Manhole Lifter is a companion device said to make lifting manhole rings a safe and easy one-man operation for precast concrete manhole rings.

For more information on companies in this article

Related Content

  • Concrete testing - defining standards
    February 13, 2012
    Concrete is a versatile construction product, but it must be tested to make sure that it is fit for purpose
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Progression in concrete plant and mixing solutions
    July 14, 2014
    Big orders for and progress in plant and concrete mixing technology has been continuing at a rapid pace over recent months, as Guy Woodford reports Shantui recently completed an eye-catching US$3.2 million deal with a customer in the United Arab Emirates for 50 concrete mixer trucks. The deal is said to be an important breakthrough for the Chinese company’s concrete machinery in the Middle East market, raising brand awareness and laying a solid foundation for building market share. Over the past y
  • Difficult terrain in Ostend
    September 1, 2022

     

    Soil stabilisation with the BOMAG RS 300 tractor-towed stabilizer.

    In the Belgian city of Ostend, soil stabilisation with lime was required for 4,000 square metres of future industrial space. The Verhelst Aannemingen company was commissioned to carry out the work. The Ostend-based family business used the BOMAG RS 300 tractor-towed stabilizer for the first time.