Skip to main content

Rotherham’s Boss Multihog

A Multihog multi-purpose utility vehicle was recently delivered to one northern England-based local authority to help keep its local road network safe and in good condition. TransLinc supplied the Mutihog machine to Rotherham Metropolitan Borough Council (RMBC) under a 10-year partnership contract. The utility vehicle is initially being used for patch planing. Along with the planer attachment the RMBC also ordered winter service attachments in readiness for next winter. Having the hydraulically operated gri
July 20, 2012 Read time: 2 mins

A Multihog multi-purpose utility vehicle was recently delivered to one northern England-based local authority to help keep its local road network safe and in good condition.

TransLinc supplied the 5009 Multihog machine to Rotherham Metropolitan Borough Council (RMBC) under a 10-year partnership contract.

The utility vehicle is initially being used for patch planing. Along with the planer attachment the RMBC also ordered winter service attachments in readiness for next winter. Having the hydraulically operated gritter unit and the heavy-duty lift, tilt and angle snow plough available will enable snow clearing to be carried out should the bad weather return before then.
 
Previous RMBC patch planing operations relied on traditional methods which involved the use of multiple vehicles and manual breaking.

“We had looked for a while for a quicker and more effective way to carry out these types of repairs. Smaller machines were not up to the job and I was of the opinion that there was definitely a gap to be filled in the market,” said David Hepworth, the council’s highways delivery manager.

The Multihog was said to be successfully trialled for two days in real-time repairs. The combination of the powerful base unit and the 400mm wide planer attachment were, according to Multihog, found to be a time saving and efficient method which also eradicated the need for manual breaking.

Planing to a depth of 125mm, the attachment is also said to save the cost of infill materials by accurately removing only what is needed. This also produces a sound base for reinstatement and is said to reduce transport and recycling costs by creating a re-usable material.

“The Multihog machine’s versatility means that we will be using it within a planned scheme of first time fixing of pot holes and for major maintenance scenarios in future,” added Hepworth.

For more information on companies in this article

Related Content

  • FM Conway lays 92% RAP in UK road
    January 22, 2024
    The project in the City of Westminster – part of the London urban area - achieved a total embodied and operational carbon saving of 78% – equal to around 100 tonnes of CO₂ equivalent.
  • Poor weather causes traffic chaos
    February 23, 2012
    The recent spate of bad weather conditions across the northern hemisphere has paralysed transport in many countries. In the US, much of northern Europe and parts of China, traffic has ground to a halt as a cold winter has resulted in heavy snowfalls in many areas. Minor roads remained blocked for some time and even major highways were badly affected, with vehicles having to be abandoned until roads could be reopened.
  • Versatile tools for road reclamation
    January 25, 2023
    A notable development in the off-highway equipment sector is the development of new generation road reclamation tools
  • Amey chooses polystyrene blocks for Scottish tunnel infill
    June 25, 2018
    Amey recently completed an infill project to make safe a disused railway tunnel underneath the approach roads north of Scotland’s Forth Road Bridge. The 420m tunnel was part of the Dunfermline to North Queensferry railway line that provided a link to the ferry service until the opening of the Forth Bridge in 1890. The 4.3m-wide and 5.1m-high tunnel with vaulted roof and brick lining continued in use for freight until 1954. The tunnel runs underneath the A9000 and B981 on the northern approach to the Forth